Welcome to 131940 Quick Information, displaying a low bandwidth version of Traffic and Travel Information showing Incidents, Closures & Limits, Special Events and Roadworks. Please use your browser's refresh button to ensure you have the latest information.
Last Updated on 24/02/2012 12:03 AM
Traffic Cameras State-wide Alerts Road Closures and Incidents Special Events Regional Road Reports Flood Maps Roadworks
State and Regional traffic cameras are available here.
The following provides a summary of access status for major roads across Queensland for both general travel and heavy vehicle industry travel. These are available as a downloadable file in a portable document format (PDF) and are time and date stamped. For the most up to date real-time road closure and incident information please refer to the Road Closures and Incidents section.
State Highways and Motorways Report
To improve and maintain the connectivity of the road network across Queensland, a number of heavy vehicle and freight restrictions are in place and are available from the Heavy Vehicle Industry Road Report.
Heavy Vehicle Industry Road Report
For conditions based around dimensions including height, width, length please see Conditions Report database.
For road closures and incidents please see Road Closures and Incidents.
For permit information and heavy vehicle guidelines please see the Heavy Vehicle Guidelines and Class Permits information page.
For further heavy vehicle information please see Transport and Main Roads Heavy Vehicle information.
To speak with the Flood Recovery Road Access Group regarding information on flood-affected heavy vehicle routes and Flood Recovery Permit applications please call the Flood Recovery Road Access Group on 1300 105 647 between 8:30am to 5:00pm Monday-Friday.
Subscribe to a daily/weekly email update for the temporary disaster related heavy vehicle mass and dimension restrictions.
BLACKSTONE
-
CUNNINGHAM HIGHWAY
08:16 PM 22/02/2012
Due to emergency works the Cunningham Hwy will be closed nightly from 6:00pm to 5:00am to all westbound at Redbank Plains Rd from Wednesday 22nd to Friday 24th February. All vehicles are advised to detour via the Centenary Hwy.
CHUWAR
-
MOUNT CROSBY ROAD (MOUNT CROSBY ROAD SERVICE ROAD)
03:17 PM 03/02/2012
Mount Crosby Road is now open to traffic at College's Crossing. Motorists are advised that a 20 tonne limit applies to all vehicles.
CHUWAR
-
ALLAWAH ROAD
06:55 PM 29/01/2012
There is currently a speed reduction in place on Allawah Road to 20 kilometres per hour. Traffic control is in place. Motorists are advised to proceed with caution at the Weir Crossing.
BOOROOBIN
-
MALENY STANLEY RIVER ROAD
02:36 PM 07/02/2011
Maleny Stanley River Road [493] - Between Maleny & Peachester Rd is Open (with caution). Open with caution one lane only.
Last Reviewed: 14 Feb 2012 at 16:42. Next Update: 17 Feb 2012 at 16:42.
ESK
-
ESK HAMPTON ROAD
10:47 AM 24/02/2011
Esk Hampton Road [414] - At Redbank Creek crossing number 3 is Open (with caution). Due to damage to bridge & pavement.
Last Reviewed: 20 Feb 2012 at 14:30. Next Update: 29 Feb 2012 at 16:43.
HAZELDEAN
-
ESK KILCOY ROAD
05:09 PM 23/02/2011
Esk Kilcoy Road [405] - South of Mt Beppo near Meiers Gully is Subject to a 15 tonne GVM limit Due to landslip.
Last Reviewed: 20 Feb 2012 at 14:30. Next Update: 29 Feb 2012 at 16:43.
MINYAMA
-
NICKLIN WAY (THE NICKLIN WAY)
11:18 PM 23/02/2012
Jessica Boulevard & Kensington Drive & Nicklin Way - Traffic Signals knocked down. Use caution in the area, emergency services in attendance.
MONTVILLE
-
PALMWOODS MONTVILLE ROAD (WOOMBYE MONTVILLE ROAD)
10:45 AM 04/03/2010
Palmwoods Montville Road [498] - Also known as Woombye-Montville Road is Closed to all vehicles due to road damage. Road closed due to Landslip.
Advice: Use alternative route.
Last Reviewed: 20 Feb 2012 at 14:25. Next Update: 29 Feb 2012 at 16:39.
OBI OBI
-
OBI OBI ROAD
11:35 AM 15/08/2011
Obi Obi Road [4962] - Downhill section of Obi Obi Road westbound between Mapleton and Kenilworth is Subject to a 5 tonne GVM limit Only cars and four wheel drive vehicles.
Last Reviewed: 20 Feb 2012 at 14:30. Next Update: 29 Feb 2012 at 16:44.
OCEAN VIEW
-
MOUNT MEE ROAD (BRISBANE WOODFORD ROAD)
09:43 AM 21/01/2011
Mount Mee Road [401] - Between Freds Rd & Rodeo Dr is Open (with caution).
Advice: Allow extra travel time.
Last Reviewed: 20 Feb 2012 at 14:25. Next Update: 29 Feb 2012 at 16:05.
PETRIE
-
GYMPIE ROAD (BRISBANE WOODFORD ROAD)
11:54 AM 25/01/2011
Gympie Road [401] - AJ Willie Bridge is Open (with caution).
Advice: Allow extra travel time.
Last Reviewed: 14 Feb 2012 at 14:25. Next Update: 29 Feb 2012 at 16:38.
PETRIE
-
DAYBORO ROAD (BRISBANE WOODFORD ROAD)
06:34 PM 01/02/2012
Dayboro Road [401_r] - At Sideling Creek Bridge is Open (with caution). The Bridge is open to traffic in both directions with a reduced speed limit of 40km/h.
Last Reviewed: 14 Feb 2012 at 14:30. Next Update: 29 Feb 2012 at 16:44.
BEECHMONT
-
BEECHMONT ROAD
04:12 PM 03/02/2012
Beechmont Road - is Open (with caution). Workers will be back on-site from Monday 6 February and the road will stay open under stop and go traffic conditions weekdays. Motorists should expect minor delays and plan accordingly.
Advice: Observe signage.
Last Reviewed: 03 Feb 2012 at 15:53. Next Update: 23 Feb 2012 at 15:53.
OXENFORD
-
TAMBORINE OXENFORD ROAD
06:52 PM 10/02/2012
Tamborine Oxenford Road - John Muntz Causeway is Open (with caution). The eastbound lane on the John Muntz Causeway on Tamborine-Oxenford Road at Oxenford is open to traffic. The speed limit will be reduced to 40km/h.
Advice: Observe signage.
Last Reviewed: 01 Feb 2012 at 10:35. Next Update: 2nd March 2012 at 15:00.
ADAVALE BLACKALL ROAD (BLACKALL ADAVALE ROAD) -
ADAVALE,
South West,
11:11 AM 22/02/2012
Adavale Blackall Road [7103] - is Open (with caution).
Last Reviewed: 22 Feb 2012 at 11:11. Next Update: when road conditions change.
ADAVALE ROAD (CHARLEVILLE ADAVALE ROAD) -
CHARLEVILLE,
South West,
12:59 PM 17/02/2012
Adavale Road (Charleville Adavale Road) - is Subject to a 5 tonne GVM limit
Advice: Proceed with caution.
Last Reviewed: 17 Feb 2012 at 12:51.
APIS CREEK ROAD (DUARINGA APIS CREEK ROAD) -
DUARINGA,
Fitzroy,
04:41 PM 30/01/2012
Apis Creek Road [5101] - Mackenzie River is Closed to all vehicles due to flooding.
Advice: Do not drive in flood waters.
Last Reviewed: 23 Feb 2012 at 09:22. Next Update: 26 Feb 2012 at 09:22.
ARAMAC ROAD -
JERICHO,
Central West,
09:26 AM 09/02/2012
Aramac Road - (Aramac - Jericho) is Restricted to four wheel drive vehicles only
Last Reviewed: 20 Feb 2012 at 16:14. Next Update: when conditions change.
ARCTURUS ROAD (KINGS WELL ROAD, TARANA ROAD) -
ARCTURUS,
Fitzroy,
09:50 AM 02/02/2012
Arcturus Road [4608] - is Open (with caution).
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 09:23. Next Update: 26 Feb 2012 at 09:23.
AVINGTON ROAD -
BLACKALL,
Central West,
11:39 AM 08/02/2012
Avington Road - is Restricted to four wheel drive vehicles only
Last Reviewed: 21 Feb 2012 at 09:05. Next Update: when conditions change.
BAJOOL PORT ALMA ROAD -
BAJOOL,
Fitzroy,
06:29 PM 31/12/2010
Bajool Port Alma Road [188] - is Open (with caution).
Last Reviewed: 23 Feb 2012 at 09:22. Next Update: 26 Feb 2012 at 09:22.
BARALABA WOORABINDA ROAD -
MIMOSA,
Fitzroy,
09:16 AM 23/02/2012
Baralaba Woorabinda Road [4632] - Dawson River is Closed to all vehicles due to flooding.
Advice: Do not drive in flood waters.
Last Reviewed: 23 Feb 2012 at 09:16. Next Update: 26 Feb 2012 at 09:16.
BARCALDINE ISISFORD ROAD -
BARCALDINE,
Central West,
10:21 AM 07/02/2012
Barcaldine Isisford Road - (Barcaldine Downs Road) is Closed to all vehicles
Last Reviewed: 20 Feb 2012 at 16:20. Next Update: when conditions change.
BLACKALL ADAVALE ROAD -
BLACKALL,
Central West,
11:38 AM 08/02/2012
Blackall Adavale Road [7103] - is Restricted to four wheel drive vehicles only
Last Reviewed: 21 Feb 2012 at 09:05. Next Update: when conditions change.
BLACKALL EMMET ROAD -
BLACKALL,
Central West,
11:41 AM 08/02/2012
Blackall Emmet Road - is Restricted to four wheel drive vehicles only
Last Reviewed: 21 Feb 2012 at 09:10. Next Update: when conditions change.
BLACKALL JERICHO ROAD -
BLACKALL,
Central West,
10:02 AM 26/01/2012
Blackall Jericho Road [441] - is Closed to all vehicles
Last Reviewed: 21 Feb 2012 at 09:04. Next Update: when conditions change.
BUNDEENA ROAD (ADVENTURE WAY) -
THARGOMINDAH,
South West,
12:25 PM 03/02/2012
Bundeena Road [94b] - Bulloo Developmental Road (Thargomindah to Bundeena) is Open (with caution).
Advice: Proceed with caution.
Last Reviewed: 20 Feb 2012 at 08:17. Next Update: when road conditions change.
BURDEKIN FALLS DAM ROAD -
RAVENSWOOD,
Northern,
10:39 AM 18/01/2012
Motorists are advised the road is opened from the Flinders Highway to the Burdekin Dam. The spillway will remain closed due to flooding until further notice.
BURKE DEVELOPMENTAL ROAD (BURKE DEVELOPMENT ROAD) -
CHILLAGOE,
Far North,
07:23 PM 25/01/2012
Burke Developmental Road [89b] - Dimbulah to Chillagoe is Open (with caution). Caution required on unsealed sections Almaden to Chillagoe.
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 10:30. Next Update: 27 Feb 2012 at 10:30.
BURKE DEVELOPMENTAL ROAD (BURKE DEVELOPMENT ROAD) -
GAMBOOLA,
Far North,
09:17 AM 19/01/2012
Burke Developmental Road [89b] - Tablelands Reg Council Boundary (44km East of Dunbar) to Ferguson's Crossing is Closed to through traffic due to flooding. Open to local 4WD traffic ONLY West of Wrotham Park with a 5 tonne local load limit. Boggy sections of black soil at Trimbles Crossing (0.24m over causeway). Road is impassable west of Highbury due to large areas of surface water and boggy sections.
Advice: Do not drive in flood waters.
Last Reviewed: 23 Feb 2012 at 10:30. Next Update: 27 Feb 2012 at 10:30.
BURKE DEVELOPMENTAL ROAD (NORMANTON DIMBULAH ROAD) -
HOWITT,
North West,
09:07 AM 05/01/2012
Burke Developmental Road [89b] - (Walkers Creek to Tablelands Regional Council boundary) is Closed to all vehicles Due to wet weather. If continuing further please review conditions in the Far North Region.
Last Reviewed: 23 Feb 2012 at 06:27. Next Update: 24 Feb 2012 .
BURKE DEVELOPMENTAL ROAD (NORMANTON CLONCURRY ROAD, NORMANTON DIMBULAH ROAD) -
NORMANTON,
North West,
09:12 AM 19/02/2012
Burke Developmental Road [89a] - (Burke & Wills Junction to Normanton) is Open (with caution). Due to recent wet weather.
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 06:27. Next Update: 24 Feb 2012.
CAPRICORN HIGHWAY -
BARCALDINE,
Central West,
07:10 AM 07/02/2012
Capricorn Highway [16d] - is Open (with caution). (Jericho - Barcaldine). Caution at the Alice River.
Last Reviewed: 20 Feb 2012 at 13:07. Next Update: 23 Feb 2012 at 13:07.
CLERMONT ALPHA ROAD -
CLERMONT,
Mackay/Whitsunday,
02:55 PM 15/02/2012
Clermont Alpha Road [552] - is Restricted to four wheel drive vehicles only Clermont-Alpha Road is open to 4WD vehicles only at Belyando River Bridge due to water over the road. Motorists are advised to obey all road signage and not attempt to cross flood waters.
Last Reviewed: 15 Feb 2012 at 14:52.
CLERMONT ROAD (CLERMONT ALPHA ROAD) -
ALPHA,
Central West,
02:06 PM 15/02/2012
Clermont Road [552] - (Alpha - Clermont) is Restricted to four wheel drive vehicles only
Last Reviewed: 20 Feb 2012 at 16:14. Next Update: when conditions change.
CLONCURRY DUCHESS ROAD (CLONCURRY DAJARRA ROAD) -
CLONCURRY,
North West,
09:35 AM 14/02/2012
Cloncurry Duchess Road [7708] - (Cloncurry to Dajarra) is Open (with caution). Road partially sealed caution during wet weather as the road is boggy and rutted.
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 09:09. Next Update: 24 Feb 2012 .
CONDAMINE MEANDARRA ROAD (MEANDARRA CONDAMINE ROAD) -
CONDAMINE,
Darling Downs,
10:27 AM 31/01/2012
Condamine Meandarra Road [345] - 10km South of Condamine (Fotheringham's Gully) is Open (with caution).
Advice: Reduced speed limit (60Km/h).
Last Reviewed: 17 Feb 2012 at 10:30. Next Update: 24 Feb 2012 at 10:30.
CRAMSIE MUTTABURRA ROAD -
MUTTABURRA,
Central West,
10:48 AM 07/02/2012
Cramsie Muttaburra Road [5705] - is Open (with caution).
Last Reviewed: 20 Feb 2012 at 16:21. Next Update: when conditions change.
DAWSON DEVELOPMENTAL ROAD (SPRINGSURE TAMBO ROAD) -
SPRINGSURE,
Fitzroy,
09:36 AM 23/02/2012
Dawson Developmental Road [87a] - Claude River is Closed to all vehicles due to flooding. Remaining sections of unsealed road are restricted to 4WD vehicles only.
Advice: Do not drive in flood waters.
Last Reviewed: 23 Feb 2012 at 09:36. Next Update: 26 Feb 2012 at 09:36.
DAWSON DEVELOPMENTAL ROAD (SPRINGSURE ROAD) -
TAMBO,
Central West,
10:24 AM 15/02/2012
Dawson Developmental Road [87a] - (Tambo - Springsure within Blackall-Tambo Shire) is Restricted to four wheel drive vehicles only
Last Reviewed: 21 Feb 2012 at 09:11. Next Update: when conditions change.
DAWSON HIGHWAY (ROLLESTON MOURA ROAD, ROLLESTON SPRINGSURE ROAD) -
ROLLESTON,
Fitzroy,
07:39 AM 23/02/2012
Dawson Highway [46d] - Panorama Creek is Open (with caution).
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 07:39. Next Update: 26 Feb 2012 at 07:39.
DIAMANTINA DEVELOPMENT ROAD (DIAMANTINA DEVELOPMENTAL ROAD) -
BEDOURIE,
Central West,
09:28 AM 20/02/2012
Diamantina Development Road [93c] - is Restricted to four wheel drive vehicles only Water over the road at channels. Proceed with caution.
Last Reviewed: 23 Feb 2012 at 09:33. Next Update: 26 Feb 2012 at 09:33.
DUNWINNIE ROAD (DUNWINNIE ROAD) -
THALLON,
South West,
09:28 AM 31/01/2012
Dunwinnie Road (Dunwinnie Road) - Noondoo to Thallon is Closed to all vehicles due to water over road. Water over road at various locations.
Advice: Do not drive in flood waters.
Last Reviewed: 16 Feb 2012 at 14:45. Next Update: when road conditions change.
GREGORY DEVELOPMENTAL ROAD -
EINASLEIGH,
Far North,
01:48 PM 08/02/2012
Gregory Developmental Road [98d] - From The Lynd to Einasleigh is Restricted to high clearance vehicles only due to water over road. Creek crossings and causeways along the Einasleigh River have water over them and formation is saturated, rutted and rough. Access is restricted to 4WD and High Clearance veichles only. .
Last Reviewed: 21 Feb 2012 at 14:15. Next Update: 24 Feb 2012 at 14:15.
GREGORY DEVELOPMENTAL ROAD -
EINASLEIGH,
Far North,
01:42 PM 08/02/2012
Gregory Developmental Road [98d] - Einasleigh Township to Quartz Blow Creek (Int Gulf Dev Rd 92C) is Closed to through traffic due to water over road. Creeks and causeways flooded. Road formation is saturated, rutted and rough. .
Last Reviewed: 21 Feb 2012 at 14:00. Next Update: 24 Feb 2012 at 14:00.
GREGORY DOWNS CAMOOWEAL ROAD -
CAMOOWEAL,
North West,
10:02 AM 09/02/2012
Gregory Downs Camooweal Road [6801] - is Restricted to four wheel drive vehicles only due to slippery sections. Drivers are requested to exercise caution and drive to prevailing conditions. The road is also boggy and rutted.
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 07:34. Next Update: 24 Feb 2012.
GREGORY HIGHWAY (SPRINGSURE EMERALD ROAD) -
SPRINGSURE,
Fitzroy,
10:19 AM 31/01/2012
Gregory Highway [27a] - Three Mile Creek, 5km north of Springsure is Open (with caution).
Advice: Reduced speed limit (60Km/h).
Last Reviewed: 23 Feb 2012 at 09:23. Next Update: 26 Feb 2012 at 09:23.
HEBEL DIRRANBANDI ROAD (CASTLEREAGH HIGHWAY) -
HEBEL,
South West,
12:54 PM 23/02/2012
Hebel Dirranbandi Road [37a] - is Subject to a 5 tonne GVM limit
Last Reviewed: 23 Feb 2012 at 12:53. Next Update: when road conditions change.
HUGHENDEN MUTTABURRA ROAD -
HUGHENDEN,
North West,
09:28 AM 14/02/2012
Hughenden Muttaburra Road [5701] - is Restricted to four wheel drive vehicles only Due to recent wet weather. Drivers are requested to drive to prevailing conditions as the road is boggy and rutted in sections.
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 09:08. Next Update: 24 Feb 2012.
HUNGERFORD ROAD -
EULO,
South West,
08:37 AM 31/01/2012
Hungerford Road [7001] - At Hungerford is Closed to all vehicles due to water over road. Water is 500mmm over the road.
Advice: Do not drive in flood waters.
Last Reviewed: 20 Feb 2012 at 08:14. Next Update: when road conditions change.
ISISFORD BLACKALL ROAD -
ISISFORD,
Central West,
10:24 AM 15/02/2012
Isisford Blackall Road [716] - is Restricted to four wheel drive vehicles only
Last Reviewed: 21 Feb 2012 at 09:04. Next Update: when conditions change.
ISISFORD EMMET ROAD -
ISISFORD,
Central West,
10:13 AM 16/02/2012
Isisford Emmet Road [7165] - (Isisford - Yaraka Via Emmet) is Open (with caution).
Last Reviewed: 20 Feb 2012 at 16:27. Next Update: when conditions change.
JUNDAH QUILPIE ROAD -
JUNDAH,
Central West,
10:13 AM 09/02/2012
Jundah Quilpie Road [717] - (Jundah - Retreat) is Closed to all vehicles due to water over road. Barcoo River at Retreat 0.77m over Causeway.
Last Reviewed: 23 Feb 2012 at 09:27. Next Update: 26 Feb 2012 at 09:27.
KALPOWAR ROAD -
MOLANGUL,
Wide Bay/Burnett,
08:33 AM 22/02/2012
Kalpowar Road [4702] - Upper and lower Kolan River is Open.
Last Reviewed: 22 Feb 2012 at 08:31.
KENNEDY DEVELOPMENTAL ROAD (HUGHENDEN WINTON ROAD) -
HUGHENDEN,
North West,
11:48 AM 07/02/2012
Kennedy Developmental Road [99b] - (Hughenden to Lynd) is Restricted to four wheel drive vehicles only 0.03m over causeway at Bundock Creek. Drivers are requested to drive with caution as the road is washed out in sections and the road is saturated and boggy.
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 09:08. Next Update: 24 Feb 2012.
KENNEDY DEVELOPMENTAL ROAD -
LYNDHURST,
Far North,
10:49 AM 08/02/2012
Kennedy Developmental Road [99b] - The Lynd to Flinders Shire Boundary (146kms North of Hughenden) is Restricted to high clearance vehicles only due to water over road. 4WD and HCV required. Water over causeways along route, Bundock Ck is 0.03m over causeway. Large sections of formation washed out, and are heavily rutted in other sections.
Advice: Do not drive in flood waters.
Last Reviewed: 21 Feb 2012 at 14:30. Next Update: 24 Feb 2012 at 14:30.
KOWARI GORGE ROAD (GORGE ROAD, PARKINSONS CONNECTION ROAD) -
FINCH HATTON,
Mackay/Whitsunday,
11:43 AM 16/02/2012
Kowari Gorge Road (Gorge Road, Parkinsons Connection Road) - is Open (with caution). Kowari Gorge Road at Finch Hatton is currently open with caution due to potholes/rough surface.
Advice: Proceed with caution.
Last Reviewed: 16 Feb 2012 at 11:35.
LANDSBOROUGH HIGHWAY -
BLACKALL,
Central West,
10:17 AM 15/02/2012
Landsborough Highway [13d] - (Blackall - Barcaldine) is Open (with caution). Speed restrictions put in place on some parts of road. Major road works .
Advice: Proceed with caution.
Last Reviewed: 21 Feb 2012 at 09:15. Next Update: when conditions change.
LANDSBOROUGH HIGHWAY -
TAMBO,
Central West,
12:52 PM 07/02/2012
Landsborough Highway [13b] - (Augathella - Tambo) is Open (with caution). No wide loads use caution.
Last Reviewed: 21 Feb 2012 at 09:10. Next Update: when conditions change.
LANDSBOROUGH HIGHWAY -
TAMBO,
Central West,
12:51 PM 07/02/2012
Landsborough Highway [13c] - (Tambo - Blackall) is Open (with caution). Speed Restrictions put in place on some parts of the road. Barcoo River Bridge is closed. Traffic diverted onto sidetrack.
Advice: Proceed with caution.
Last Reviewed: 21 Feb 2012 at 09:15. Next Update: when conditions change.
LEICHHARDT HIGHWAY -
TAROOM,
Fitzroy,
06:43 AM 08/02/2012
Leichhardt Highway [26a] - 1km north of Taroom is Open (with caution).
Advice: Reduced speed limit (60Km/h).
Last Reviewed: 23 Feb 2012 at 09:24. Next Update: 26 Feb 2012 at 09:24.
LONGREACH MUTTABURRA ROAD -
LONGREACH,
Central West,
03:23 PM 25/01/2012
Longreach Muttaburra Road - (Via Crossmore) is Closed to all vehicles
Last Reviewed: 20 Feb 2012 at 16:22. Next Update: when conditions change.
MAY DOWNS ROAD -
MAY DOWNS,
Mackay/Whitsunday,
09:55 AM 30/01/2012
May Downs Road [5122] - is Closed to all vehicles due to flooding. The closure is at Isaac River Bridge.
Advice: Do not drive in flood waters.
Last Reviewed: 15 Feb 2012 at 02:45.
MITCHELL HIGHWAY -
CUNNAMULLA,
South West,
08:05 AM 20/02/2012
Mitchell Highway [23a] - Barringun to Cunnamulla is Open (with caution). Water is over the road at various locations.
Advice: Proceed with caution.
Last Reviewed: 20 Feb 2012 at 08:04. Next Update: when road conditions change.
MOONIE HIGHWAY -
ST GEORGE,
South West,
10:13 AM 22/02/2012
Moonie Highway [35a] - Westmar to St George at Thuraggi Crossing is Open.
Last Reviewed: 22 Feb 2012 at 10:12. Next Update: 25 Feb 2012 at 10:12.
NAPOLEON ROAD -
QUILPIE,
South West,
09:39 AM 08/02/2012
Napoleon Road - is Subject to a 5 tonne GVM limit
Last Reviewed: 17 Feb 2012 at 12:55.
NEVERFAIL ROAD -
BLACKALL,
Central West,
10:05 AM 09/02/2012
Neverfail Road - is Closed to all vehicles
Last Reviewed: 21 Feb 2012 at 09:10. Next Update: when conditions change.
PENINSULA DEVELOPMENTAL ROAD -
COEN,
Far North,
01:11 PM 29/12/2011
Peninsula Developmental Road [90d] - Between Coen Airport and Weipa is Closed to through traffic due to road damage. A 5 tonne local load limit applies. .
Last Reviewed: 21 Feb 2012 at 14:40. Next Update: 24 Feb 2012 at 14:40.
PENINSULA DEVELOPMENTAL ROAD -
LAURA,
Far North,
01:49 PM 08/02/2012
Peninsula Developmental Road [90c] - From 2km north of Laura Township to Coen is Closed to through traffic due to water over road. 5 tonne local access only to permit holders.
Last Reviewed: 21 Feb 2012 at 14:40. Next Update: 24 Feb 2012 at 14:40.
PRAIRIE ROAD -
TABLEDERRY,
Central West,
03:54 PM 14/02/2012
Prairie Road - is Restricted to four wheel drive vehicles only
Advice: Proceed with caution.
Last Reviewed: 20 Feb 2012 at 16:26. Next Update: when conditions change.
QUILPIE WINDORAH ROAD (DIAMANTINA DEVELOPMENTAL ROAD) -
WINDORAH,
Central West,
04:44 PM 13/02/2012
Quilpie Windorah Road (Diamantina Developmental Road) - is Closed to all vehicles Closed at Cooper Creek - 0.29m above approaches.
Last Reviewed: 22 Feb 2012 at 10:24. Next Update: 25 Feb 2012 at 10:24.
RETREAT WINDORAH ROAD -
WINDORAH,
Central West,
09:39 AM 14/02/2012
Retreat Windorah Road - is Closed to all vehicles
Last Reviewed: 23 Feb 2012 at 09:26. Next Update: 26 Feb 2012 at 09:26.
RICHMOND WINTON ROAD -
ALBION,
North West,
09:07 AM 07/02/2012
Richmond Winton Road [5803] - (Within the Richmond Shire Council boundary) is Restricted to four wheel drive vehicles only due to deep wheel tracks. And washouts in sections of the road. Excess mass and dimension vehicles are not permitted to travel this road.
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 09:07. Next Update: 24 Feb 2012 .
RICHMOND WINTON ROAD -
CORFIELD,
Central West,
11:34 AM 10/02/2012
Richmond Winton Road [5803] - is Restricted to four wheel drive vehicles only Recommend high clearance vehicles.
Advice: Proceed with caution.
Last Reviewed: 20 Feb 2012 at 16:25. Next Update: when conditions change.
ROAD -
MUTTABURRA,
Central West,
03:45 PM 14/02/2012
Road - Hughenden - Muttaburra Road (Flinders Shire - Muttaburra) is Restricted to four wheel drive vehicles only
Last Reviewed: 20 Feb 2012 at 10:21. Next Update: when conditions change.
ROMA TAROOM ROAD -
EUROMBAH,
Fitzroy,
05:09 PM 23/02/2012
Roma Taroom Road [4397] - is Closed to all vehicles due to flooding.
Advice: Do not drive in flood waters.
Last Reviewed: 23 Feb 2012 at 17:08. Next Update: 26 Feb 2012 at 17:08.
ROMA TAROOM ROAD -
EUROMBAH,
Darling Downs,
03:44 PM 23/02/2012
Roma Taroom Road [4397] - Between Slatehill Creek and Burradoo Road is Closed to through traffic At Kangaroo Creek due to flooding.
Advice: Do not drive in flood waters.
Last Reviewed: 23 Feb 2012 at 15:30. Next Update: 27 Feb 2012 at 10:30.
RUTHERFORD ROAD -
MOUNT COOLON,
Mackay/Whitsunday,
03:56 PM 10/02/2012
Rutherford Road - is Restricted to four wheel drive vehicles only due to potholes/rough surface. Rutherford Road is open to 4WD only with extreme caution at Blacks Creek and also just north of Rosetta Creek.
Advice: Proceed with caution.
Last Reviewed: 15 Feb 2012 at 14:18.
STAGMOUNT ROAD -
PELICAN CREEK,
Central West,
03:45 PM 14/02/2012
Stagmount Road - is Restricted to four wheel drive vehicles only Caution: Washouts at Reedy Creek.
Last Reviewed: 20 Feb 2012 at 16:16. Next Update: when conditions change.
STRATHMORE ROAD -
SPRINGLANDS,
Mackay/Whitsunday,
04:39 PM 30/01/2012
Strathmore Road - is Open (with caution). Strathmore Road is open with caution at Bowen River Bridge due to some damage sustained from recent wet weather.
Advice: Proceed with caution.
Last Reviewed: 15 Feb 2012 at 14:18.
STURT STREET -
CHARLEVILLE,
South West,
02:52 PM 09/02/2012
Sturt Street [23c] - Bridge No 3 at Ormston's Gully in Charleville is Closed to all vehicles due to bridge/culvert damaged.
Last Reviewed: 20 Feb 2012 at 08:18. Next Update: when road conditions change.
TAMBO ROAD (ALPHA TAMBO ROAD) -
ALPHA,
Central West,
02:08 PM 15/02/2012
Tambo Road [443] - (Barcaldine Shire Boundary - Tambo) is Restricted to four wheel drive vehicles only
Last Reviewed: 20 Feb 2012 at 13:08. Next Update: 23 Feb 2012 at 13:08.
TAMBO ROAD (ALPHA TAMBO ROAD) -
ALPHA,
Central West,
02:09 PM 15/02/2012
Tambo Road [443] - is Restricted to four wheel drive vehicles only
Last Reviewed: 21 Feb 2012 at 09:15. Next Update: when conditions change.
THOMSON DEVELOPMENTAL ROAD (JUNDAH LONGREACH ROAD) -
JUNDAH,
Central West,
04:35 PM 21/02/2012
Thomson Developmental Road [95a] - is Restricted to four wheel drive vehicles only ,0.36m above approaches.
Last Reviewed: 23 Feb 2012 at 09:27. Next Update: 26 Feb 2012 at 09:27.
TORRENS CREEK ARAMAC ROAD (ARAMAC TORRENS CREEK ROAD) -
TORRENS CREEK,
North West,
09:30 AM 14/02/2012
Torrens Creek Aramac Road [5703] - is Restricted to four wheel drive vehicles only Due to recent wet weather. Drivers are requested to drive to prevailing conditions as the road is boggy and rutted in sections.
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 09:09. Next Update: 24 Feb 2012.
TUMBAR ROAD -
BLACKALL,
Central West,
11:40 AM 08/02/2012
Tumbar Road - is Restricted to four wheel drive vehicles only
Last Reviewed: 21 Feb 2012 at 09:06. Next Update: when conditions change.
WARBRECCAN ROAD (STONEHENGE WARBRECCAN ROAD) -
STONEHENGE,
Central West,
10:29 AM 31/01/2012
Warbreccan Road (Stonehenge Warbreccan Road) - is Closed to all vehicles .Thomson River 0.80 metres above bridge.
Last Reviewed: 23 Feb 2012 at 09:24. Next Update: 26 Feb 2012 at 09:24.
WARD ROAD (TAMBO WARD RIVER ROAD) -
TAMBO,
Central West,
11:59 AM 14/02/2012
Ward Road (Tambo Ward River Road) - is Open (with caution).
Last Reviewed: 21 Feb 2012 at 09:13. Next Update: when conditions change.
WILLS DEVELOPMENTAL ROAD (WILLS DEVELOPMENT ROAD) -
FOUR WAYS,
North West,
09:28 AM 10/02/2012
Wills Developmental Road [78a] - (Burke & Wills Junction to Gregory) is Open (with caution). Drivers are requested to exercise caution as there is still water present in low lying areas.
Advice: Proceed with caution.
Last Reviewed: 23 Feb 2012 at 07:34. Next Update: 24 Feb 2012 .
WILLS STREET (DONOHUE HIGHWAY) -
BOULIA,
Central West,
01:32 PM 22/02/2012
Wills Street (Donohue Highway) - (Boulia - QLD/NT Border) is Closed to all vehicles Closed at Glenormiston.
Last Reviewed: 22 Feb 2012 at 13:31. Next Update: 25 Feb 2012 at 13:31.
YABBA CREEK ROAD (YABBA ROAD) -
IMBIL,
Wide Bay/Burnett,
09:29 AM 23/02/2012
Yabba Creek Road [4832] - At Yabba Creek bridge is Open (with caution).
Advice: Do not drive in flood waters.
Last Reviewed: 23 Feb 2012 at 09:28. Next Update: 26 Feb 2012 at 09:28.
CARRARA
-
NERANG BROADBEACH ROAD
12:32 AM 23/02/2012
Gold Coast Suns vs Brisbane Lions Vs Melbourne
Start: Saturday 25 February at 7.10pm (EDT)
Metricon Stadium, Nerang-Broadbeach Road, Carrara
There is no public parking available for this event, and event parking restrictions will enforced on the roads surrounding the stadium.
Passengers in possession of an event ticket can travel free with TransLink to and from the event on scheduled Surfside bus and Queensland Rail train services (conditions apply).
Free bus shuttles will operate to and from the stadium:
Travelling from the north - park at Helensvale Train Station, catch a train to Nerang and get on the free shuttle to Metricon Stadium, or take a bus to Pacific Fair in Broadbeach then catch a free shuttle to Metricon Stadium.
Travelling from the south - park at Varsity Lakes or Robina Train Station, catch a train to Nerang and get on the free shuttle to Metricon Stadium, or take a bus to Pacific Fair in Broadbeach then catch a free shuttle to Metricon Stadium.
For information on transport options, please view the Metricon Stadium website or call (07) 5510 6000.
FLINDERS STREET (FLINDERS MALL) -
TOWNSVILLE CITY,
Northern,
06:00 AM 02/08/2011
Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday commencing 14 August 2011. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event.
JAMES STREET -
TOOWOOMBA CITY,
Darling Downs,
10:00 AM 25/02/2012
Due to the Lights on the Hill Truck Convoy held on Saturday 25th of February 2012 there will be an increased volume of heavy vehicles on the Warrego Highway between Toowoomba & Gatton.
This will be affecting Eastbound traffic only.
The following regional road reports are provided as a point-in-time reference only. The reports are produced hourly seven days a week. For the most up to date road status information, please check the full textual list of road closures listed above as they are updated as soon as conditions change.
Central West Region Road Report
Darling Downs Region Road Report
Mackay/Whitsunday Region Road Report
Metropolitan Region Road Report
North Coast Region Road Report
South Coast Region Road Report
Wide Bay/Burnett Region Road Report
The following flood maps are provided as a point-in-time reference only. The maps do not replace the full textual list of road closures listed above as they are updated as conditions change.
The maps are provided as a visual representation of road closures currently affecting the road network at an individual regional level.
Maps are updated at approximately 11:00am each day Monday to Friday. Please note maps are only provided for regions with active road closures due to wet weather and flooding, if a region does not have any active road closures there will be no map provided.
The flood maps now display five colours in use that represent conditions of affected roads. A legend is now available at the top of each map. The colours being:
— Purple for 4WD / High Clearance
— Blue for Open (with conditions)
— Pink for Excess Mass or Dimensions
— Orange for Load restriction
— Brown for Closed
| Regional boundaries map |
BURBANK
-
MOUNT COTTON ROAD
07:00 AM 15/11/2011
Stage 1 construction works are being undertaken at the intersection of Mt Cotton and Alperton Roads at Burbank, as part of the Redlands Corridor Program. Works commenced 14 November and are expected to be completed in late 2012, weather permitting. Works will be carried out from 7am to 5pm Monday to Saturday. For more information please contact the project team at Redland@tmr.qld.gov.au or by phone 3137 8297.
CAPALABA
-
MOUNT COTTON ROAD
11:24 AM 08/11/2011
Stage 1 construction works are being undertaken at the intersection of Mt Cotton Road, Ney Road and Avalon Road at Capalaba, as part of the Redlands Corridor Program. Works will commence 7 November and are expected to be completed in mid-2012, weather permitting. Works will be carried out from 7am to 5pm Monday to Saturday. For more information please contact the project team at redland@tmr.qld.gov.au or by phone 3137 8421.
CAPALABA
-
MOUNT COTTON ROAD
02:07 PM 09/11/2011
The Department of Transport and Main Roads is undertaking safety improvement works on Mount Cotton Road and Duncan Road between Avalon Road and Taylor Road at Sheldon.
Works will commence early December 2011 and will be completed by mid-February 2012, weather permitting. Works will be carried out from 7am to 5pm, Monday to Friday.
FOREST LAKE
-
LOGAN MOTORWAY
04:00 PM 13/02/2012
Construction work sites are being established in and around the Logan Motorway until March 2012, and remain in place until mid-2013.
As part of these works there will be changed traffic conditions on sections of the Logan motorway Interchange including:
reduced speed limits
intermittent minor traffic delays between 7 am and 5pm weekdays
partial lane closures during off peak periods.
intermittent night works between 8pm and 5am.
Variable message signs will be in place. Please take care and observe all signage when driving through the area.
Works include:
establishing entry access points to work sites
installing temporary traffic barriers
temporary road widening and line marking
temporarily relocating guard rails.
For more information contact the project team on 1800 067 684 or email info@trackstar.com.au
KELVIN GROVE
-
INNER CITY BYPASS (HALE STREET)
11:19 AM 20/01/2012
From Tuesday 17 January until late March 2012, service relocation works will be undertaken on the Inner City Bypass (ICB) and Ithaca Street at Kelvin Grove.
Sewerage and water mains are currently located underneath the eastbound lanes of the ICB and need to be relocated to allow for the continued construction of Brisbane City Council's legacy way tunnel project.
For safety reasons and to minimize impacts on roads users, these service relocations will require single lane closures overnight on both the eastbound and westbound ICB lanes from 17 January until late March.
A single westbound lane closure on the ICB and a full closure of Ithaca Street will be in place from 8pm Friday to 5am Monday each weekend during this period, with works to be carried out 24 hours a day. During the week, Ithaca street will be reduced to one lane both during the day and night.
Signage and traffic control will be in place to direct motorists around the works as required. A detour will be signed during the full closure of Ithaca Street to direct motorists to take the Caxton street exit, turn on to Caxton street and then left again on to Petrie Terrace.
Background:
Legacy Way is Brisbane City Council’s 4.6km road tunnel that will connect to Western Freeway at Toowong with the ICB at Kelvin Grove. It will provide an alternative route to local roads for traffic leaving the Western freeway and travelling to and from the ICB.
When it opens, Legacy Way will reduce, by up to 44% the peak hour travel time of journeys from the Centenary Bridge to the ICB.
For More information:
Email; info@transcity.com.au
Toll free number: 1800 778 772
Visit: www.legacyway.com.au
KELVIN GROVE
-
INNER CITY BYPASS (HALE STREET)
06:00 AM 09/12/2011
In mid-December 2011, the Inner City Bypass (ICB) will be reduced to two lanes of traffic eastbound, between Victoria Park Road and the Inner Northern Busway.
Concrete barriers, screening and traffic signage will be in place for the safety of motorists and construction workers. The speed limit in this area will be reduced to 60km/h.
The Victoria Park Road exit and entry from the ICB will also change, with the relocated Victoria Park Road open to all vehicles.
A roundabout will be created on the new Victoria Park Road for the safety of all vehicles.
These traffic changes are required to allow for the continued construction of Brisbane City Council’s Legacy Way tunnel project.
Background:
Legacy Way is Brisbane City Council’s 4.6km road tunnel that will connect the Western Freeway at Toowong
with the ICB at Kelvin Grove. It will provide an alternative route to local roads for traffic leaving the Western Freeway and travelling to and from the ICB.
When it opens, Legacy Way will reduce, by up to 44%, the peak hour travel time of journeys from the Centenary Bridge to the ICB.
For more information:
Email: info@transcity.com.au
Toll free number: 1800 778 772
Visit: www.legacyway.com.au
RICHLANDS
-
CENTENARY HIGHWAY
11:54 PM 19/01/2012
Cycle access closure: Centenary Highway between Garden Road, Richlands and Springfield Parkway, Springfield Lakes 23 January to late 2012.
To ensure the safety of cyclists during construction of the Darra to Springfield Transport Corridor Stage 2 Richlands to Springfield Project, cycle access will be temporarily closed along the Centenary Highway between Garden Road, Richlands and Springfield Parkway, Springfield Lakes.
This closure will take effect from Monday 23 January 2012 and will stay in place until late 2012.
An alternative route has been identified via Clendon Street, Waterford Road, Boundary Road, Addison Road, Old Logan Road, Nev Smith Drive, Sprinfield Link Bridge, Ellen Circuit, James Josey Avenue, Lakeside Avenue to Springfield Lakes Boulevard. The project team apologises for any inconvenience this closure may cause cyclists.
At project completion, cyclists will have access to more than 7km of new pathways connecting Springfield to the Brisbane cycle network. This will include a 4.2km dedicated cycle path and 2.9km of shared pedestrian and cycles paths.
These works are part of the Queensland Government's Richlands to Springfield project which will improve public transport options between Springfield and Brisbane.
For more information contact the project team on 1800 067 684.
RIPLEY
-
CUNNINGHAM HIGHWAY ON RAMP (CUNNINGHAM HIGHWAY)
05:58 PM 17/02/2012
Due to emergency works, the Cunningham Highway will be closed to all westbound traffic at Redbank Plains Road from Wednesday 22nd to Friday 24th of February, works will take place nightly from 6.00pm to 5.00am.
All westbound traffic will be detoured via the Centenary Highway to Yomanto.
TOOWONG
-
WESTERN FREEWAY ON RAMP (MOUNT COOT THA ROAD ON RAMP)
12:00 PM 31/03/2011
Construction of Legacy Way (formerly Northern Link) has commenced at the western work site, on the northern side of the Western Motorway in Toowong. Legacy Way is a 4.6km underground toll road that will connect the Western Motorway, at Toowong, with the Inner City Bypass, at Kelvin Grove.
Construction of Legacy Way is expected to be complete by late 2014.
Speed limits will apply within the works area and motorists are advised to slow down and pay attention to signage. The majority of works will take place from 6.30am - 6.30pm Monday to Saturday. For more information contact the project team on 1800778772 or www.transcityjv.com.au
BOOROOBIN
-
MALENY STANLEY RIVER ROAD
01:48 PM 07/02/2011
Maleny-Stanley River Road has one lane open to traffic, with caution between Mears Road and Kilcoy-Beerwah Road. Temporary traffic control signals in operation. Last reviewed 19/10/2011.
COAL CREEK
-
ESK KILCOY ROAD
12:58 PM 20/01/2012
Drainage work on Esk Kilcoy Rd near Coal Creek Rd started on 16 January 2012 and there is a single lane closure required under stop-go traffic control during work hours (7am - 5pm). This lane closure is required for the safety of roadworkers and road users. The road will return to two-lane traffic with a reduced speed limit outside work hours. It is expected that this work will be completed by late February 2012, weather permitting.
Thank you for your patience during these works which are being undertaken as part of the department’s Transport Network Reconstruction Program (TNRP).
If you require further information on these works, please contact the TNRP team on 1800 459 366.
DAYBORO
-
MOUNT MEE ROAD (BRISBANE WOODFORD ROAD)
01:28 PM 30/01/2012
30/01/2012 - 31/08/2012
Reconstruction works will be occurring on Brisbane Woodford Road (Mt Mee Range Section) until September 2012. Traffic will be reduced to one way contraflow arrangement throughout different sections on the Range during these works. Traffic controllers will be in attendance during works hours and outside of these hours temporary traffic signals will be in operation. Last reviewed 30/01/2012
ELIMBAH
-
BEERBURRUM ROAD
01:03 PM 30/01/2012
There is currently a side track in operation beside the Six Mile Creek bridge on Beerburrum Road at Elimbah whilst a new bridge and approches are constructed.Oversized vehicles are not permitted to use this side track. Works are scheduled for completion by late April 2012. Last reviewed 30/01/2012.
HIGHVALE
-
MOUNT GLORIOUS ROAD (SAMFORD MOUNT GLORIOUS ROAD)
11:30 AM 21/02/2011
Roadworks are occurring on Samford / Mt Glorious Rd at Highvale due to road subsidence. One lane is closed under temporary traffic signal control. Last reviewed 19/10/2011.
JIMNA
-
KILCOY MURGON ROAD
08:54 AM 31/01/2011
Kilcoy-Murgon Road is open to one lane of traffic at Jimna under give way signage. Last reviewed 19/10/2011.
MAPLETON
-
MAPLETON ROAD (NAMBOUR MAPLETON ROAD)
09:39 AM 07/02/2012
Nambour Mapleton Road has been reduced to single lane traffic under 24 hour traffic control near Willandra Place for culvert repair works to be completed. A 40km/h speed limit applies. These works are due for completion Early April 2012.
MOORE
-
DAGUILAR HIGHWAY (MAIN STREET)
05:05 PM 14/09/2011
The Department of Transport and Main Roads would like to advise that the D’Aguilar Highway through the Blackbutt Range will remain operating as a single lane under traffic control. The department had intended opening the Blackbutt Range to two lanes by Christmas. With recent wet weather, the program of works has been delayed and the highway cannot be safely opened to two lanes. The highway will remain operating as a single lane under 24-hour traffic control, with a 3-metre width limit. Westbound traffic can move through on the hour and every half hour. Eastbound traffic can move through at quarter past and quarter to the hour.
Works on the Blackbutt Range are occurring as part of Operation Queenslander, which is the largest reconstruction effort in Queensland’s history, rebuilding communities, fixing infrastructure and restoring regional communities. The project is being delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA), a joint federal and state initiative.
You can find information about this project on the Department of Transport and Main Roads website, www.tmr.qld.gov.au by searching for Blackbutt Range. Road users can also register to receive free SMS updates at www.blackbuttrangesms.com.au.
For up-to-date information on traffic disruptions, please phone 13 19 40 or visit www.131940.qld.gov.au. Updated 26.12.2011
PEACHESTER
-
PEACHESTER ROAD (KILCOY BEERWAH ROAD, COOCHIN STREET)
01:10 PM 30/01/2012
30/01/2012 - 30/05/2012
Road widening works reconstruction works are occurring on Kilcoy-Beerwah Road (Peachester Road) on the Peachester Range. Traffic will be reduced to a one way contraflow arrangement. Traffic controllers will be in place during work hours and traffic signals will be in operation outside of work hours. Works are due to complete at the end of May 2012. Last Reviewed 30/01/2012
PEACHESTER
-
PEACHESTER ROAD (KILCOY BEERWAH ROAD, COOCHIN STREET)
04:43 PM 27/01/2011
The Department of Transport and Main Roads would like to provide you with an update about reconstruction works to be undertaken on Kilcoy-Beerwah Road at Peachester Range.
As you are aware, the flooding events of January 2011 significantly impacted on Kilcoy-Beerwah Road, which sustained landslips and pavement damage.
The department has been working to design a solution for the reconstruction of Kilcoy-Beerwah Road that takes into account the complex geology of this area. It has now been determined that the solution will be to reconstruct the road by excavation on the uphill side.
This moves the road alignment away from the slip zone, increasing the safety margin for motorists and construction workers, and provides opportunities to improve drainage and the road alignment.
Work on the reconstruction of Kilcoy-Beerwah Road at Peachester Range is expected to start in late January 2012 and be completed by Easter 2012, weather permitting.
During the reconstruction project there are not likely to be any full closures of this road. There may be some short delays where traffic will be stopped to enable plant and equipment to be moved in or out of work sites.
The single lane closure under temporary traffic signals will remain in place for the duration of these works. This lane closure is necessary for the safety of roadworkers and road users. Variable Message Signs will be located in both directions on the range to advise motorists of changes to traffic conditions and any restrictions.
The department appreciates the delays are an inconvenience, and I thank you for your patience and understanding while these works are undertaken. We will continue to keep the community informed as these works progress.
If you require further information on this project, please call the department’s Transport Network Reconstruction Team on 1800 459 366 or email reconstruct_northcoast@tmr.qld.gov.au.
Last Updated 24/01/2012.
WITTA
-
MALENY KENILWORTH ROAD
12:22 PM 23/06/2011
Restoration works are being carried out on Maleny Kenilworth Road due to a landslide. Temporary traffic signals are in place. Last reviewed 19/10/2011.
BILINGA
-
GOLD COAST HIGHWAY (COOLANGATTA ROAD)
04:47 PM 17/02/2012
Gold Coast Highway—Bilinga Interchange, Bilinga
• Night works will take place this Friday 17 February and Monday 20 February 2012 on the Gold Coast Highway and Terminal Drive intersection, Bilinga.
• Motorists can expect some lane closures southbound and northbound and limited access into Terminal Drive from Gold Coast Highway with detours in place.
• Works will take place between 8pm and 5am.
• Roadworks will continue until mid-2012 on the Gold Coast Highway at Bilinga at Coolangatta Road and Terminal Drive.
• Various lane closures will be ongoing through this project.
• Two lanes will remain open in both directions during peak times.
Working hours
• From 6.30am to 5.30pm Monday to Friday.
• From 6.30am to 4pm Saturday as required.
BROADBEACH
-
AUSTRALIA AVENUE
04:51 PM 17/02/2012
Gold Coast Rapid Transit, Broadbeach
Roadwork and associated activities are occurring on both sides of the Gold Coast Highway between the intersections of Aubrey Street, Surfers Paradise and Australia Avenue, Broadbeach. The main traffic changes in this area include:
• The intersection of Australia Avenue and the Gold Coast Highway will be closed intermittently for short periods of time on Monday 20 February 2012. Police and traffic controllers will be on site to direct motorists during these times.
• Changed traffic conditions at the intersection of the Gold Coast Highway, Remembrance Drive and Surfers Paradise Boulevard to realign these roads in preparation for the light rail system. Traffic can travel on the Gold Coast Highway through this intersection north and south, but all turning movements have been removed with the exception of the left-hand turn from Surfers Paradise Boulevard into the highway heading south.
• These changed conditions will continue until early to mid-2012. Motorists should expect delays during peak times and are advised to use alternative routes if possible.
• Temporary intersection closures are continuing along the Gold Coast Highway at Second Avenue, St Kilda Avenue, Rosewood Avenue and Britannia Avenue.
• The left-hand turn out of Armrick Avenue onto the Gold Coast Highway is temporarily closed until mid-2012. Armrick Avenue motorists will be able to access the Gold Coast Highway via Surf Parade and Australia Avenue to the south or Wharf Road to the north. The left-turn into Armrick Avenue from the Gold Coast Highway will remain open.
• Night work will occur on the Gold Coast Highway between Surfers Paradise Boulevard, Surfers Paradise and Australia Avenue, Broadbeach, between 6.30pm and 6.30am, Sunday to Thursday nights inclusive. In some sections of the work zone, the Gold Coast Highway will be reduced to one lane of traffic in each direction with the speed limit reduced to 40km/h.
KALBAR
-
CUNNINGHAM HIGHWAY
04:53 PM 17/02/2012
Cunningham Highway - Cunningham's Gap.
Work is underway at Cunningham’s Gap on the Cunningham Highway.
Motorists can expect delays while final asphalt repairs and resurfacing through the Gap is underway. This work will be carried out under daytime stop/go traffic conditions (maximum 500 m at a time).
This work is expected to be completed by the end of February 2012, weather permitting.
Work is expected to commence at the most badly damaged site, Clayton’s Gully, in February 2012. As this is a new section of road, there will be minimal disruption to traffic while construction is underway. This work is expected to be completed by mid-2012, weather permitting.
MUDGEERABA
-
GOLD COAST SPRINGBROOK ROAD
03:53 PM 17/02/2012
Gold Coast-Springbrook Road (between Berrigans Road & Monaro Road), Mudgeeraba
• Hours of work will be 6.30am to 5.00 pm.
• One lane will be open to traffic during this time, under ‘stop go’ conditions.
• Speed through the work zone will be reduced to 40km/h.
These works are subject to weather and construction conditions and may need to be rescheduled.
MUDGEERABA
-
ROBINA PARKWAY
04:48 PM 17/02/2012
Pacific Motorway (Exit 82)—Robina Interchange
Day works
• The Robina Parkway traffic westbound has been switched to the new temporary alignment.
• Motorists can expect single lane closures and reduced speed limits on Robina Parkway and Somerset Drive.
• Please be aware of increased traffic volumes now that school has resumed.
Night works
• Night works will continue in the southbound lanes along the M1 between Mudgeeraba Creek bridge and Robina Parkway overbridge.
• These works will require single lane closures; short delays to motorists on the M1 southbound are expected.
Working hours
• Day works from 7am to 5pm, Monday to Friday and 7am to 3pm Saturday.
• Night works from 8pm to 5am, Sunday to Thursday.
These works are subject to weather and construction conditions and may need to be rescheduled.
NERANG
-
PACIFIC MOTORWAY (PACIFIC HIGHWAY, NERANG CONNECTION ROAD)
04:49 PM 17/02/2012
Pacific Motorway (Exit 73–Exit 77)—Nerang (South) to Worongary
• Work will continue throughout the site on the M1 between Exit 73 (Nielsens Road) at Nerang (South) and Exit 77 (Gooding Drive) at Worongary.
• Northbound and southbound lanes of the M1 will be intermittently closed.
• Speed is reduced to 80km/h through the work zone.
Working hours
• Day works from 6.30am to 6pm, Monday to Friday, 7am to 5pm on Saturday.
• Night works along the M1 from Nerang South to Worongary: Northbound—8pm to 5am, Monday and 7pm to 5am Tuesday to Friday, 7pm to 7am Saturday and 9pm to 7am Sunday. Southbound—8pm to 5am Saturday to Thursday and 9pm to 5am Friday.
OXENFORD
-
TAMBORINE OXENFORD ROAD
04:54 PM 17/02/2012
The John Muntz Causeway on Tamborine-Oxenford Road at Oxenford is open to traffic in the eastbound lane.
- Traffic signals are in place to manage traffic flow. Adherence to these traffic signals is enforceable by law.
- CCTV is in place to monitor traffic flow and driver behaviour.
- The speed limit will be reduced to 40km/h.
- Motorists should expect delays and plan accordingly.
Urgent repair works have been carried out to allow the lane to open as quickly as possible after the causeway was closed following flooding of the Coomera River in late January 2012. Planning to replace the existing causeway with a bridge has been fast-tracked.
PALM BEACH
-
GOLD COAST HIGHWAY (GOLD COAST HIGHWAY SERVICE ROAD, THROWER DRIVE)
04:52 PM 17/02/2012
Gold Coast Highway—19th to 8th Avenues,
Palm Beach
Motorists are advised that works will continue for approximately six months, weather permitting.
What to expect:
• Works will be staged to minimise impacts to motorists.
• Traffic will be set-up under a contra-flow arrangement, e.g. southbound traffic will be redirected to the northbound inside lane.
• On-street parking will be restricted during works.
• Access to businesses will be provided at all times, however points of access may change during the project.
Working hours
• 6.30am to 5.30pm, Monday to Friday.
• 6.30am to 3pm, Saturday as required.
PALM BEACH
-
PACIFIC HIGHWAY (PACIFIC MOTORWAY)
04:48 PM 17/02/2012
Pacific Motorway (Exit 92)—Palm Beach Avenue interchange
Roadwork has commenced on the Pacific Motorway, between Palm Beach Avenue and Nineteenth Avenue. Due to traffic volumes on the motorway this work is being carried out at night.
• Night works will be ongoing until April 2012.
• Motorists can expect single lane closures and reduced speed limits on the Pacific Motorway.
Working hours
• From 7pm to 5am, Sunday to Thursday.
PARKWOOD
-
SMITH STREET (SMITH STREET CONNECTION ROAD)
04:52 PM 17/02/2012
Smith Street Motorway, Parkwood
Early works are continuing along the Smith Street Motorway.
• Works in the area will be ongoing for the next three to four months and motorists can expect frequently changing road conditions, including reduced speed limits and lane closures on the Smith Street Motorway.
• Pedestrians and cyclists should also follow the directions of traffic controllers and signage as some paths may be temporarily closed during works.
Working hours
• From 7am to 5pm—Monday to Friday (and Saturday as required) for the next three to four months.
SOUTHPORT
-
QUEEN STREET (SOUTHPORT SCHOOL ACCESS, SOUTHPORT NERANG ROAD)
05:02 PM 17/02/2012
Gold Coast Rapid Transit, Southport
Zone 1: Queen Street (Wardoo Street to Nerang Street)
• Site maintenance and restoration works are continuing in Queen Street.
Working hours
• From 6.30am Monday to Saturday.
• Night works are carried out between 8pm and 5am.
SOUTHPORT
-
NERANG STREET (SOUTHPORT NERANG ROAD)
05:02 PM 17/02/2012
Zone 2a: Nerang Street (Queen Street to High Street)
• Works are progressing and are expected to be completed by 25 February 2012. Pedestrians are being redirected around works under the direction of traffic controllers.
• During the week of 27 February 2012, works will be undertaken along Nerang Street (between Queen Street and High Street). Activities will occur largely at night, however some day works will also be required. Access to businesses will be maintained and traffic controllers will be stationed in the area to assist and direct motorists.
Working hours
• From 6.30am Monday to Saturday.
• Night works are carried out between 8pm and 5am.
SOUTHPORT
-
NERANG STREET (SOUTHPORT NERANG ROAD)
04:56 PM 17/02/2012
Zone 2b: Nerang Street (High Street to Davenport Street)
• Traffic along Nerang Street will shortly be moved onto the final road alignment and some centre parking in Nerang Street will be temporarily reinstated.
Working hours
• From 6.30am Monday to Saturday.
• Night works are carried out between 8pm and 5am.
SOUTHPORT
-
QUEEN STREET (SOUTHPORT SCHOOL ACCESS, SOUTHPORT NERANG ROAD)
04:57 PM 17/02/2012
Zone 3: Queen Street (Lenneberg Street to Marine Parade via Ada Bell Way) and Scarborough Street (Queen Street to Park Lane)
• This fortnight, works will be undertaken along Queen Street between Lenneberg Street and Ada Bell Way. Temporary lane closures will occur from time-to-time during works and traffic controllers will be stationed in the area to assist and direct motorists.
• Following completion of these works, traffic will be moved onto the final road alignment.
Working hours
• From 6.30am Monday to Saturday.
• Night works are carried out between 8pm and 5am.
WORONGARY
-
PACIFIC HIGHWAY (PACIFIC MOTORWAY, PACIFIC HIGHWAY)
04:50 PM 17/02/2012
Pacific Motorway (Exit 75)—Elysium Road, Worongary
Weekend Closure
• M1 southbound, Elysium Road (Exit 75) on and off-ramps from 8pm Friday 17 February until 5am Monday 20 February 2012.
• The M1 southbound on and off-ramps at Elysium Road (Exit 75), access to and from the M1 at Elysium Road (Exit 75) will be closed for this weekend only.
What to expect
• On the M1, the southbound off-ramp to Elysium Road will be closed for the whole weekend.
• On Elysium Road, the M1 southbound on-ramp will be closed for the whole weekend.
• Speed will be reduced to 40km/h in the work zone.
• Traffic controllers will direct traffic during these works.
• Motorists are asked to drive with care, follow the directions of traffic controllers and to seek alternative routes. These works are subject to weather and construction conditions and may need to be rescheduled.
ANGUS SMITH DRIVE -
DOUGLAS,
Northern,
08:00 AM 01/02/2012
Maintenance works on the pedestrian bridge at Angus Smith Drive, Douglas, will commence 1 February 2012 8:00am and finish 29 February 2012 5:00pm. Please drive carefully in the area.
ANZAC AVENUE (GORE HIGHWAY) -
DRAYTON,
Darling Downs,
09:00 AM 20/02/2012
Roadworks are occurring at the intersection of the Gore Highway and Toowoomba Karara Road in Toowoomba.
The project is a Targeted Road Safety Improvement Project (Safer Roads Sooner).
Work will be completed by mid April 2012, between the hours of 09.00am and 03.00pm.
Refer to Excess Mass and Dimension Conditions on TMR website for further details.
There will be reduced speed limits, partial lane closures and traffic control will be in place.
Motorists can expect delays.
ANZAC AVENUE -
HARRISTOWN,
Darling Downs,
09:00 AM 19/02/2012
Roadworks will be occurring along the Gore Highway between James Street and Stephen Street in Toowoomba.
These works are Street Light Maintenance.
Work is commencing 19/02/2012 to 25/03/2012 between the hours of 09.00am & 03:00pm. (Sunday Only)
There will be reduced speed limits and partial lane closures.
Motorists can expect delays.
BARRINGUN ROAD (MITCHELL HIGHWAY) -
BARRINGUN,
South West,
04:17 PM 27/01/2012
Roadworks are commencing on the Mitchell Highway between Barringun and Cunnamulla approx 21km North of Barringun. Delays of up to 10 minutes can be expected during construction. Reduced speed limits are also in place
BARWON HIGHWAY -
NORTH TALWOOD,
Darling Downs,
07:00 AM 23/01/2012
Roadworks will be occuring along the Barwon Highway, 6km East of Talwood.
These works are flood related reconstruction works.
Work is commencing late January 2012 & will be completed by the end of Febuary 2012.
Work times will be between the hours of 06:00am and 06:00pm.
There will be reduced speed limits, partial lane closures and traffic control will be in place.
BENWELL ROAD -
SOUTH TOWNSVILLE,
Northern,
11:36 AM 17/02/2012
TOWNSVILLE PORT ACCESS ROAD - Construction works on the new Ross River Bridge
Mariners are reminded that height and width restrictions are now in effect on the Ross River, at the site of the new Ross River Bridge in South Townsville. The maximum beam of vessels travelling through the construction site must not exceed eight metres and the maximum height of vessels must not exceed six metres.
For more information about these restrictions, please call 1800 625 648
BOORAL ROAD -
BOORAL,
Wide Bay/Burnett,
05:06 PM 20/02/2012
There will be soil sampling undertaken at a number of locations along Booral Road. A reduced speed limit will be in place for the safety of roadworkers and motorists. At times, the road may be limited to one lane under traffic control. For further information on these works, please contact the communication team on 1300 728 390.
BOUNDARY STREET (TOWNSVILLE PORT ROAD) -
SOUTH TOWNSVILLE,
Northern,
09:00 AM 09/02/2012
Works to upgrade power poles at Boundary Street (Townsville Port Road), South Townsville, will commence 7 February 2012 9:00am and finish 29 February 2012 3:00pm. Traffic controllers, speed restrictions and a single lane closure will be in place adjacent the Fourth Avenue intersection, with traffic flow alternating in each direction. Minor delays are to be expected.
BOURBONG STREET (BUNDABERG BARGARA ROAD) -
BUNDABERG CENTRAL,
Wide Bay/Burnett,
01:45 PM 09/02/2012
Works to upgrade the pedestrian crossing facilities and traffic lanes at the Bourbong and Maryborough streets intersection will begin on Monday, 13 February. The works will be undertaken between 6am and 6pm, Monday to Friday, and are expected to be completed in April (weather permitting). Motorists and pedestrians should expect changed conditions, including reduced speed limits and pedestrian detours, and should observe all safety signage and traffic control measures. For further information, please contact the communication team during business hours on 1300 728 390, or email bundaberg.office@tmr.qld.gov.au.
BOWEN STREET (WARREGO HIGHWAY) -
ROMA,
South West,
12:00 AM 21/11/2011
Roadworks to commence on sections the Warrego Highway - Bowen Street in Roma between Bungil Creek and Quintin Street. This will include intersection closures, some delays 5 to 10 mins for traffic, with speed restrictions and temporary detours.
BROAD STREET (BRUCE HIGHWAY) -
SARINA,
Mackay/Whitsunday,
04:47 PM 20/01/2012
Bruce Highway- Roadworks are occurring on the Bruce Highway (Broad Street) on the southern approach to Sarina and will continue until June 2012, weather permitting. Current traffic changes include no right turn into Central Street for southbound traffic on the Bruce Highway. Access to Central Street (Marlborough-Sarina Road) for southbound traffic is available via Anzac Street and Brandon Street. A u-turn facility is provided just north of Central Street for traffic exiting Central Street and wanting to travel south on the Bruce Highway. For further information please contact the Mackay/Whitsunday region on 4951 8555.
BROADSOUND ROAD -
OORALEA,
Mackay/Whitsunday,
05:01 PM 20/01/2012
Bruce Highway- Roadworks are occurring on the Bruce Highway on the southern approach to Mackay at Boundary Road intersection and at Peak Downs Highway intersection (City Gates). Works are expected to continue until March 2012. Traffic changes are currently in place on Boundary Road (west) which is limited to one way traffic and right out, left out only at the Bruce Highway. Access to Boundary Road is via Bernborough Ave, Cowleys Road or Schmidtkes Road. For further information please contact the Mackay/Whitsunday region on 4951 8555.
BROADSOUND ROAD -
OORALEA,
Mackay/Whitsunday,
03:47 PM 09/05/2011
Bruce Highway - Roadworks are occurring on the Bruce Highway on the southern approaches to Mackay at Boundary Road intersection and at Peak Downs Highway intersection (City Gates). Works are expected to continue until March 2012. Traffic changes are currently in place on Boundary Road (west) which is limited to one way traffic and right-out, left-out only at the Bruce Highway. Access to Boundary Road will be via Bernborough Ave, Cowleys Road or Schmidtkes Road. For further information on these works, please contact Mackay/Whitsunday Region on 4951 8555.
BRUCE HIGHWAY -
ALLIGATOR CREEK,
Northern,
11:47 AM 17/02/2012
BRUCE HIGHWAY - Alligator Creek to Tindall Court
PAVEMENT RECONSTRUCTION AND DRAINAGE WORKS
Work is continuing on the reconstruction of the Bruce Highway between Alligator Creek and Tindall Court.
Works will occur Monday to Friday, between 6:00am and 6:00pm and each Saturday, between 6:00am and 2:00pm.
Speed restrictions, single-lane closures and traffic controllers will be in place during the works, and delays are expected. Works in this area are expected to be completed in late March 2012.
BRUCE HIGHWAY -
BALBERRA,
Mackay/Whitsunday,
11:36 AM 11/10/2011
Bruce Highway - Roadworks are occurring on the Bruce Highway south of Mackay between Alligator Creek Bridge and Baronga Drive with the construction of an overtaking lane and are expected to be completed in mid 2012, weather permitting. For further information please contact Mackay/Whitsunday region on 4951 8555.
BRUCE HIGHWAY (TOWNSVILLE ROAD) -
BAMBAROO,
Northern,
11:36 AM 09/02/2012
Works to install signage will occur at the Bruce Highway, south of Frosty Mango, from 1 February 2012 8:00am to 30 April 2012 5:00pm. Changed traffic conditions will be in place for the duration of these works.
BRUCE HIGHWAY (CARDWELL RANGE ROAD) -
BEMERSIDE,
Northern,
12:00 PM 17/02/2012
CARDWELL RANGE REALIGNMENT UPDATE
Major earthworks are continuing on the realignment of the Bruce Highway through the Cardwell Range. The speed limit through the Cardell Range is reduced to 60 km/h for the duration of the project. The Hinchinbrook Lookout will remain closed until mid - 2012.
A major traffic switch is now current on the southern side of the Cardwell Range. The traffic switch involves the Bruce Highway traffic being temporarily diverted onto the new Lookout Access Road. This will enable the final cutting through the crest to be made and the pavement to be constructed. Signed detours will be in place for the duration of the project.
TRAFFIC DISRUPTIONS
As works progress, intermittent single lane closures on the Cardwell Range will occur. Delays of up to 15 minutes may be experienced during these closures.
CLOSURE OF HIGHWAY FOR BLASTING
Highway closures for blasting will occur well into 2012. Generally blasts will be conducted fortnightly on a Wednesday afternoon at 2:00pm. Occasionally due to wet weather the date of the blasts may have to be changed at short notice. Every effort will be made to notify the travelling public of any changes to the regular schedule.
For more information about the Cardwell Range Realignment project, please contact the project team via:
Telephone: 1300 796 662
Fax: 4772 6335
Email: Cardwell@ebc.net.au
Web: www.ebc.net.au/Cardwell
BRUCE HIGHWAY -
BENARABY,
Fitzroy,
10:47 AM 23/01/2012
Reconstruction roadworks are underway on the Bruce Highway (six sites between Benaraby and Rockhanpton). The road is open but delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of road workers.
BRUCE HIGHWAY -
BLACK RIVER,
Northern,
05:00 PM 23/02/2012
Asphalt works will be occuring on the Bruce Highway, at the intersection of Black River Road, will commence 23 February 2012 5:00pm and finish on the 25 February 2012 5:00am. Speed reductions and traffic controllers will be in place for the duration of these works.
BRUCE HIGHWAY -
BRANDON,
Northern,
03:50 PM 22/02/2012
BRUCE HIGHWAY (DRYSDALE ST) - Brandon Road Reconstruction works
Essential reconstruction work is continuing from south of the DAL SANTOS CULVERTS to north of the Burdekin Sewerage Treatment Plant.
Due to width restrictions a wide load detour is in place for the duration of this project. Vehicles over 3.5 metres are advised they must use the wide load detour. Please check the Transport and Main Roads website for more information.
Heavy transport vehicles under 3.5m, for example, semi-trailers and B-doubles, must continue to use the Bruce Highway through the project site.
Works are focussing on improving the road and ensuring the road meets the national highway standard.
The Bruce Highway is reduced to one lane and the speed is reduced to 40km/h. Motorists are advised to expect minor delays. Works are expected to be completed in mid-March.
Work is planned to commence to reconstruct the Spiller Street intersection in March 2012. These works will focus on improving safety and access.
Motorists are encouraged to slow down and drive to the conditions of the road. This will allow work crews to complete their work quickly and safely.
For more information about these works or to register for email updates, please contact Community Engagement Services.
Freecall:1800 625648 or Email: engagement.northern@tmr.qld.gov.au
BRUCE HIGHWAY -
CHERWELL,
Wide Bay/Burnett,
10:14 AM 22/02/2012
Work to construct a heavy vehicle rest area is under way on the Bruce Highway (southbound) at Nulla Flats, south of the Cherwell River. The works are expected to be completed in mid-March, weather permitting. For the safety of motorists and roadworkers, a reduced speed limit will be in place for the duration of the works. At times, the highway will be reduced to one lane. Traffic controllers will assist with managing traffic flow and delays may be experienced. Motorists are asked to obey all safety signage and traffic controllers' instructions when travelling through the worksite. For more information, please contact the communication team in Bundaberg on 1300 728 390 during business hours, or email bundaberg.office@tmr.qld.gov.au.
BRUCE HIGHWAY -
CLEMANT,
Northern,
07:00 AM 12/05/2011
Maintenance works will occur alongside the Bruce Highway, at various locations between Townsville and north of Rollingstone, from 12 May 2011 7:00am to 11 May 2012 4:00pm. A partial closure of the road shoulder and adjacent lane will be in place during work hours with signage, speed restrictions and traffic controllers on site for the duration of the works.
BRUCE HIGHWAY -
COLES CREEK,
Wide Bay/Burnett,
12:36 PM 21/10/2011
The Department of Transport and Main Roads would like to advise motorists the Bruce Highway will be
temporarily closed just south of Carlson Road (north) to Traveston Road for brief periods from
Monday 24 October 2011. These temporary closures are to ensure the safety of motorists while low impact controlled blasting occurs adjacent to the existing highway as part of construction work for the new Traveston interchange. The blasts will occur between 12 pm and 2 pm Monday to Friday, Weather permitting.
Motorists will encounter short delays of up
to ten minutes while the highway is closed as blasting occurs. Motorists should follow the instructions of traffic controllers and construction signage to ensure the safety of workers and the public. Blasting work in this area is expected to be completed by the end of 2011, weather permitting.
We apologies for any inconvenience this work may cause and would like to thank motorists for their
patience. For further information about construction activities of the Cooroy to Curra upgrade, please contact the project team on 1800 180 566 or brucehwyc2c@tmr.qld.gov.au.
BRUCE HIGHWAY -
JULAGO,
Northern,
09:00 AM 18/08/2011
VARIOUS STATE CONTROLLED ROADS - PLACEMENT OF VMS BOARDS
10 AUGUST 2011 - 9 MAY 2016
The following major roads will have portable VMS boards placed on the following roads to provide community information prior to bushfire season.
FLINDERS HIGHWAY ( Roseneath)
BRUCE HIGHWAY ( Julago)
HERVEY RANGE ROAD (Kalynda Chase)
BRUCE HIGHWAY (Veales Rd to Blackriver)
FLINDERS HIGHWAY (Charters Towers)
BRUCE HIGHWAY (Ayr South)
BRUCE HIGHWAY (BRUCE HIGHWAY SERVICE ROAD) -
MCDESME,
Northern,
06:00 AM 06/02/2012
The Bruce Highway, Ayr and Home Hill - Erection of signs in various locations. This will occur until 28 February 2013. In Ayr the times will be between 6:00am and 7:00am and in Home Hill between the hours of 8:00am and 9:00am. Traffic control will be onsite please drive with caution when travelling through the area.
BRUCE HIGHWAY (ROE STREET) -
MIRIAM VALE,
Fitzroy,
10:46 AM 23/01/2012
Reconstruction roadworks are underway on the Bruce Highway (ten sites between Gin Gin and Benaraby). The road is open but delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of road workers.
BRUCE HIGHWAY (ROE STREET) -
MIRIAM VALE,
Fitzroy,
02:40 PM 22/02/2012
Reconstruction roadworks are underway on the Bruce Highway (twelve sites between Gin Gin and Benaraby). The road is open but delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of road workers.
BRUCE HIGHWAY -
MOURILYAN,
Far North,
08:07 AM 12/12/2011
There is damage to the traffic island southbound at the intersection of the Bruce Hwy and Mill Street, Mourilyan. Motorists are advised to drive with caution.
BRUCE HIGHWAY -
MUTARNEE,
Northern,
10:00 PM 10/02/2012
Temporary traffic counting equipment will be in use on the Bruce Highway, Mutarnee, at the Volk Road and Barrilgie Road intersections from 10 February 2012 10:00pm to 2 March 2012 4:00am. Changed traffic conditions will be in place at times during installation and removal.
BRUCE HIGHWAY -
NOME,
Northern,
12:52 PM 18/11/2011
A vending site will be situated on the roadside near the intersection of the Bruce Highway and Bentley Drive, Nome on Tuesday's and Saturday's between the hours of 9:00am and 6:00pm.
BRUCE HIGHWAY (INGHAM ROAD) -
SHAW,
Northern,
07:00 AM 05/12/2011
Construction works will occur alongside the Bruce Highway, Shaw, at the Shaw Road intersection from 5 December 2011 7:00am to 2 March 2012 6:00pm. Traffic control, signage and speed restrictions will be in place.
BRUCE HIGHWAY (INGHAM ROAD) -
SHAW,
Northern,
08:51 AM 31/10/2011
Townsville City, Hinchinbrook Shire, Charter Towers Regional, Burdekin Shire will be slashing parts of the road reserve at various locations within the Northern Region. This will be occurring over a year starting on the 27 October 2011 to the 27 October 2012.
BRUCE HIGHWAY (INGHAM ROAD) -
SHAW,
Northern,
02:25 PM 09/02/2012
Works to install signage will occur on the Bruce Highway, Shaw, near the North Shore Boulevard intersection from 25 January 2012 7:00am to 30 March 2012 5:00pm. Traffic controllers and speed restrictions will be in place during these works.
BRUCE HIGHWAY -
ST LAWRENCE,
Mackay/Whitsunday,
04:29 PM 20/01/2012
Bruce Highway- Roadworks are occurring at Waverley Creek Rest Area, south of Mackay with construction of a heavy vehicle rest area and upgrading of the existing rest area. The rest area is expected to be operational in April 2012, weather permitting. For further information please contact the Mackay/Whitsunday region on 4951 8555.
BRUCE HIGHWAY -
TIARO,
Wide Bay/Burnett,
03:10 PM 20/01/2012
Roadwork is occurring on the Bruce Highway between Mungar Road and the heavy vehicle stopping place at Tiaro. A reduced speed limit will be in place while work is underway for the safety of roadworkers and motorists. At times, the road may be limited to one lane under traffic control. For further information on these works, contact the communication team on 1300 728 390.
BRUCE HIGHWAY -
TORBANLEA,
Wide Bay/Burnett,
03:12 PM 20/01/2012
Work to upgrade the Bruce Highway and Torbanlea-Pialba Road intersection is underway. A reduced speed limit is in place for the safety of roadworkers and motorists. For further information on these works, please contact the communciation team on 1300 728 390.
BRUCE HIGHWAY -
TRAVESTON,
Wide Bay/Burnett,
11:45 AM 03/02/2010
Roadworks are occurring on Section B of the Bruce Highway Upgrade (Cooroy to Curra) between Sankeys Road and Traveston Road. For further information about construction activities, contact the project team on 1800 180 566 or brucehwyc2c@tmr.qld.gov.au
BUNDOCK STREET -
BELGIAN GARDENS,
Northern,
06:00 AM 25/02/2012
Repair works on the footpath at Bundock Street between Little Street and St James Drive,Belgian Gardens will commence 25 February and finish 29 February 2012. On weekdays the works will begin at 6:00am and continue until 3:00pm and on Saturday the works will commence at 9:00am and finish at 3:00pm. Signage, Speed reduction and traffic controllers will be on site for the duration of the works.
BUNYA HIGHWAY -
COORANGA,
Darling Downs,
06:00 AM 05/12/2011
Roadwork's are occurring on the Bunya Highway at Porters Gap 60km north of Dalby.
Theses works are flood related due to the extreme January weather.
Speed limit has been reduced for safety until recovery works are finished.
This works is expected to take some months to complete.
Restrictions are in place on vehicles over 6.5 m wide. Refer to Excess Mass and Dimension Conditions on TMR website for further details.
Motorist are advised to take care when driving in this area.
BURKE DEVELOPMENTAL ROAD (BURKE DEVELOPMENT ROAD) -
CHILLAGOE,
Far North,
08:00 AM 21/11/2011
A 30km section of the Burke Developmental Road east of Chillagoe, has poor road surface conditions. The speed limit has been reduced to 50km/h for the safety of motorists.
CAPRICORN HIGHWAY -
DUARINGA,
Fitzroy,
10:47 AM 23/01/2012
Reconstruction roadworks are underway on the Capricorn Highway (three sites between Rockhampton and Duaringa). The road is open but delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of road workers.
CAPRICORN HIGHWAY (CAPRICORN HIGHWAY SERVICE ROAD) -
EMERALD,
Fitzroy,
10:48 AM 23/01/2012
Reconstruction roadworks are underway on the Capricorn Highway (four sites between Duaringa and Emerald). The road is open but delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of road workers.
CAPRICORN HIGHWAY (CAPRICORN HIGHWAY SERVICE ROAD) -
THE GEMFIELDS,
Fitzroy,
02:34 PM 11/01/2012
Reconstruction roadworks are underway on the Capricorn Highway (one site between Emerald and Anakie). The road is open but delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of road workers.
CAPTAIN COOK HIGHWAY -
ELLIS BEACH,
Far North,
05:30 AM 14/09/2011
Slope stabilisation works are continuing on the Captain Cook Hwy. The work will repair the roadside above the highway, south of Ellis Beach, damaged by consecutive wet weather events.
Works will be carried out Monday to Saturday, 6:00am to 6:00pm, until late January 2012, weather permitting. For the safety of roadworkers and motorists, the road will be reduced to one lane, with traffic controllers and traffic signals where required.
Motorists can expect delays of up to 15 minutes through the construction site during working hours.
Civil Team Engineering will carry out the works on behalf of the department.
The reconstruction work is being delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA), a joint federal and state initiative. Your patience and cooperation is appreciated while the works are underway.
For more information, please call 1800 184 317* or email reconstruct_cairns@tmr.qld.gov.au
* Free call from anywhere in Australia, call charges apply for calls from mobile phones and payphones.
(1563I)
CARNARVON HIGHWAY (CARNARVON DEVELOPMENTAL ROAD) -
GUNNEWIN,
South West,
02:36 PM 08/07/2011
Roadworks are underway on the Carnarvon Highway (Roma - Injune) from Injune south to Gunnewin. Delays of up to 20 mins can be expected. Traffic lights will be operating and reduced speed limits are also in place.
CARNARVON HIGHWAY (CARNARVON DEVELOPMENTAL ROAD) -
INJUNE,
South West,
02:35 PM 08/07/2011
Roadworks are underway on the Carnarvon Highway (Injune - Rolleston) approximately 20km north of Injune. Delays of up to 20 mins can be expected. Traffic lights and reduced speed limits are in place.
CARNARVON HIGHWAY (CARNARVON DEVELOPMENTAL ROAD) -
ROMA,
South West,
02:32 PM 08/07/2011
Roadworks are underway on the Carnarvon Highway (Surat - Roma) from the Warrego Highway intersection (near Roma) south to Blyth Creek. Delays of up to 20 mins can be expected. Traffic controllers and traffic lights will be operating. Reduced speed limits are also in place.
CHINCHILA TARA ROAD (CHINCHILLA TARA ROAD) -
CROSSROADS,
Darling Downs,
06:00 AM 03/01/2012
Roadworks are occurring along Chinchilla - Tara Road.
These work include a temporary access arrangement on each side of Chinchilla Tara Road and vegetation clearing.
Work is commencing 03/01/2012 to 30/03/2012 between the hours of 06.00am and 06.00pm.
There will be reduced speed limits, partial lane closures and traffic control will be in place.
Motorists are being advised to exercise caution.
CUNNINGHAM HIGHWAY -
TREGONY,
Darling Downs,
06:00 AM 09/01/2012
Work will recommence at Cunningham’s Gap on the Cunningham Highway on 09/01/2012.
The work will include completion of reconstruction work, asphalt repairs and resurfacing at West of Fig Tree Gully, Fig Tree Gully and Six Penny Gully.
This work is expected to be completed by mid-2012, weather permitting.
Motorists can expect delays as work will be carried out under stop/go traffic conditions
CUNNINGHAM HIGHWAY -
WARWICK,
Darling Downs,
07:00 AM 23/02/2012
Roadworks are occurring along the Cunningham Highway between the Eight Mile & Glengallan Road.
These works include a road surface re-seal.
Work is commencing 23/02/12 to 06/03/12 between the hours of 07:00am & 05:00pm.
There will be reduced speed limits, partial lane closures and traffic control will be in place.
Moderate delays are to be expected.
DAGUILAR HIGHWAY -
YARRAMAN,
Darling Downs,
06:00 AM 30/01/2012
Roadwork's are occurring on the D’Aguilar Highway, 10 km East of Yarraman.
This work is recontruction works.
Work is commencing 30/01/12 to 02/03/12 between the hours of 06:00am & 06:00pm Monday to Friday, weather permitting.
There will be partial lane closures and speed reductions will be in place.
Motorists are being advised to expect delays & exercise caution.
DIRRANBANDI HEBEL ROAD (CASTLEREAGH HIGHWAY) -
DIRRANBANDI,
South West,
02:25 PM 08/07/2011
Roadworks are underway on the Castlereagh Highway (St George - Hebel) between Dirranbandi and Hebel. Delays of up to 15 mins can be expected. During daylight hours traffic control will be in place. Traffic lights will be operating at night. Reduced speed limits are also in place.
DISCOVERY DRIVE -
DOUGLAS,
Northern,
04:40 PM 23/01/2012
Road maintenance and construction of a new car park access will occur on Discovery Drive, Douglas, adjacent the Townsville Hospital access road from 23 January 2012 6:00am to 20 March 2012 5:00pm. Changed traffic conditions will be in place including speed restrictions. Delays are expected.
DOUGLAS ARTERIAL ROAD (THE RING ROAD, BRUCE HIGHWAY) -
DOUGLAS,
Northern,
12:53 PM 22/02/2012
DOUGLAS ARTERIAL DUPLICATION PROJECT - NIGHTWORKS
Week commencing Monday 27 February 2012
NIGHTWORKS WILL BE CARRIED OUT ALONG VARIOUS SECTIONS OF THE MOTORWAY FOR TWO WEEKS FROM MONDAY 27 FEBRUARY, WEATHER PERMITTING.
The night works are scheduled from 7:00pm to 6:00am as follows:
MONDAY 27 FEBRUARY AND TUESDAY 28 FEBRUARY
Asphalting will occur along the northbound motorway section between the Angus Smith Drive on-ramp and the Riverside Boulevard overpass. Traffic will be reduced to one lane, and the speed will be reduced to 40 km/h.
WEDNESDAY 29 FEBRUARY AND THURSDAY 01 MARCH
Asphalting will occur along the section of the motorway and off-ramp to Riverway Drive from the Ross River bridge northwards. Traffic will be reduced to one lane, and the speed will be reduced to 40 km/h, with traffic controllers on site.
WEDNESDAY 29 FEBRUARY AND THURSDAY 01 MARCH
The removal of temporary barriers in the section along the start of the motorway northbound from University Road to the University Road overpass will occur, weather permitting. Traffic will be realigned and reduced to a speed of 40 km/h.
THURSDAY 01 MARCH AND FRIDAY 02 MARCH
Removal of the double white lines in the southbound lane of the motorway will occur. Traffic will be reduced to one lane, and the speed will be reduced to 40km/h, with traffic controllers on site.
MONDAY 05 MARCH TO FRIDAY 09 MARCH
Asphalting will occur along the start of the motorway from University Road to the University Road overpass. Traffic will be reduced to one lane and reduced to a speed of 40km/h. University Road will be closed from the start of the motorway and under the overpass to the Yolanda Drive/Discovery Drive roundabout. Local traffic is advised to turn off University Drive at MacArthur Drive or follow the motorway detour.
DOUGLAS ARTERIAL ROAD (THE RING ROAD, BRUCE HIGHWAY) -
DOUGLAS,
Northern,
03:22 PM 15/02/2012
DOUGLAS ARTERIAL DUPLICATION -
On Saturday 25 February, weather permitting, sealing in the area north of the existing northbound on-ramp to the motorway from Angus Smith Drive will require intermittent stoppages of up to 5 minutes, under the direction of traffic controllers.
ANGUS SMITH DRIVE AND RIVERSIDE BOULEVARD - UNTIL MARCH 2012, SUBJECT TO WEATHER
** Residents using Windarra Avenue, Angus smith Drive and Riverside Boulevard are advised to allow extra time for journeys.
** The Angus Smith Drive - Riverside Boulevard intersection continues to operate under "Stop" signage until a new signalised intersection is completed as part of the new motorway on-ramp construction.
PLEASE TAKE CARE
* All roadwork schedules and timelines are weather permitting and subject to change.
* Electronic signs (VMS boards) are on site to alert motorists to changed traffic conditions.
* Unless otherwise signed, an 80km/h speed limit is in place throughout the entire project site.
* Drivers are asked to be alert to changing traffic conditions.
For further information, please contact the Douglas Arterial Duplication info line on 4771 4805 / 0408972536 or email dad@balfourconsulting.com.au
EDWARDS STREET -
AYR,
Northern,
10:00 AM 06/03/2012
Works to repair the service pole on Edwards Street between Craig Street and Lynch Street, Ayr will commence 06 March 2012 between 10:00am and 12:00pm. There will be access only via the road shoulder. Signage, speed reduction and traffic controller will be on site for the duration of the works.
ESK HAMPTON ROAD (HAMPTON ESK ROAD) -
RAVENSBOURNE,
Darling Downs,
06:00 AM 14/07/2011
Roadworks are occurring along the Esk Hampton Road at Ravensbourne.
Theses works are flood related due to the extreme January weather.
A diversion route is in place around these roadworks.
Work is expected to be completed by the end of September 2012.
Motorists are being advised to expect delays, exercise caution and allow additional travel time.
EUNGELLA DAM ROAD -
EUNGELLA,
Mackay/Whitsunday,
03:13 PM 03/01/2012
Eungella Dam Road- Roadworks are occurring on Eungella Dam Road between Broken River to just south of Freegards Road and are expected to be completed by mid 2012, weather permitting. Traffic is under single lane operation during work hours and motorists can expect minor delays. For further information regarding these works please contact the Mackay/Whitsunday region on 1300 736 754.
FITZROY DEVELOPMENT ROAD (DINGO MOUNT FLORA ROAD, IDNGO MOUNT FLORA ROAD) -
VALKYRIE,
Mackay/Whitsunday,
03:32 PM 21/06/2011
Fitzroy Developmental Road - Reconstruction works are occurring on Fitzroy Devleopmental Road between the Middlemount turn-off and the Peak Downs Highway. The works include pavement reconstruction on various sections of road and are expected to be ongoing until late 2013. Traffic may be restricted to single lane operation during working hours and motorists can expect some delays. For further information on these works, please contact Mackay office on 4951 8555.
FLINDERS HIGHWAY -
BREDDAN,
Northern,
12:47 PM 17/02/2012
FLINDERS HIGHWAY - 10 MILE CREEK
CONSTRUCTION OF OVERTAKING LANES
Works are continuing on the construction of overtaking lanes east of Ten Mile Creek. Works will occur between 6:00am and 6:00pm. Speed restrictions will be in place. Please follow the instructions of traffic controllers.
FLINDERS HIGHWAY -
MOSMAN PARK,
Northern,
09:00 AM 15/12/2011
Maintenance works in the road shoulder of the Flinders Highway, Mosman Park, will commence 15 December 2011 9:00am and finish 28 February 2012 3:00pm. Speed restrictions and traffic controllers will be in place.
FLINDERS STREET (FLINDERS MALL) -
TOWNSVILLE CITY,
Northern,
08:30 AM 17/05/2011
Various roads within the Townsville City area - As of 10 May 2011 until 9 May 2012 between 8:30am and 5:00pm, IDL maintenance works will be conducted on the road shoulders. Speed reductions and Traffic Controllers will be on site for the duration of these works.
GARGETT MIA MIA ROAD -
SEPTIMUS,
Mackay/Whitsunday,
03:05 PM 03/01/2012
Gargett-Mia Mia Road- Roadworks are occurring on sections of Gargett-Mia Mia Road and are expected to be completed by early 2012, weather permitting. Traffic is under single lane operation during work hours and motorists can expect minor delays. For further information regarding these works please contact the Mackay/Whitsunday region on 1300 736 754.
GATTON CLIFTON ROAD (CLIFTON GATTON ROAD) -
PILTON,
Darling Downs,
07:00 AM 21/11/2011
Roadwork's are occurring along Gatton Clifton Road,2km north of Pilton.
These works include replacement of a timber bridge at Kings Creek.
Work to be completed by end of June 2012 between the hours of 6am to 6pm, Monday to Friday.
A Side track in place around this area.
Traffic controllers will be on site.
Motorists are being advised to expect delays, exercise caution and allow additional travel time.
GORE HIGHWAY -
PAMPAS,
Darling Downs,
07:00 AM 24/02/2012
Roadworks will be occurring along the Gore Highway between Fysch Rd & Pfeffer Rd at Pampas.
This works involve replacement of power poles.
Work is commencing on 24/02/2012 to 23/03/2012 between the hours 07.00am and 05.00pm.
Traffic control will be in place. Motorists can expect minor delays
GREGORY DEVELOPMENTAL ROAD -
BROUGHTON,
Northern,
02:47 PM 07/02/2012
GREGORY DEVELOPMENT ROAD - Approximately 40km south of Charters Towers.
Reconstruction works have commenced on the Gregory Development Road between Victoria Creek Bridge and Little Policeman Creek Bridge, 40km south of Charters Towers. Traffic control, speed restrictions and signage will be in place for the duration of the works. Works include flood damage and pavement restoration works, as well as widening and stabilisation works.
Delays of up to 15 minutes may be experienced during the reconstruction works.
GREGORY DEVELOPMENTAL ROAD -
GREENVALE,
Northern,
10:50 AM 03/05/2011
GREGORY DEVELOPMENT ROAD - Between Charters Towers and Greenvale
PAVEMENT AND CULVERT WORKS
Ongoing rehabilitation works will occur between 6:00am and 6:00pm. At times, single lane closures and speed restrictions will be in place. Please follow the instructions of traffic controllers.
GREGORY HIGHWAY -
EMERALD,
Fitzroy,
10:49 AM 23/01/2012
Reconstruction roadworks are underway on the Gregory Highway (three sites between Emerald and Clermont). The road is open but delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of road workers.
GULF DEVELOPMENTAL ROAD -
CROYDON,
Far North,
02:37 PM 22/12/2011
Roadworks at various locations to remove and replace gravel, cement modifying and bitumen seal will be commencing late December and continuing through until June 2012.
GULF DEVELOPMENTAL ROAD (MOUNT SURPRISE HIGHWAY) -
MOUNT SURPRISE,
Far North,
12:30 PM 22/11/2011
Works to repair sections of the Gulf Development road damaged by cyclone and flooding events in 2010/11 will be carried out between 6 am to 6 pm, Monday to Saturday, and will continue until June 2012. Motorists are advised to expect changed traffic conditions including speed reductions & lane closures.
GYMPIE KIN KIN POMONA ROAD (KIN KIN ROAD) -
WOLVI,
Wide Bay/Burnett,
11:20 AM 17/01/2012
The speed limit is reduced to 60kmh on Kin Kin Road through the gravel section between Parsons Road and Buckley Road at Wolvi. Motorists are advised to drive to the changed conditions and obey all signage.
HALIFAX ROAD (HERBERT STREET, INGHAM HALIFAX ROAD) -
INGHAM,
Northern,
07:00 AM 03/01/2012
Works to construct a new access road off Ingham-Halifax-Bemerside Road, Ingham, near the Bruce Highway intersection will start 3 January 2012 7:00am and finish 29 February 2012 5:00pm. Traffic control, signage and speed restrictions will be in place.
HERBERT STREET (BRUCE HIGHWAY) -
INGHAM,
Northern,
08:06 AM 15/02/2012
Footpath construction works on Herbert Street Rotary Park (Bruce Highway), Ingham will commence 13 February 2012 8:00am and finish 1 March 2012 5:00pm. Traffic controllers and signage will be in place for the duration of these works.
HUGH STREET -
CURRAJONG,
Northern,
04:57 PM 08/12/2011
Hugh Street will have a partial closure with Woolcock Street, Boundary Street and Saunders Street with speed reductions signs and roadwork signs from 7.00am 7 December 2011 to 6.00pm 30 April 2012. Please drive with caution if travelling on these roads.
HUME STREET -
TOOWOOMBA CITY,
Darling Downs,
09:30 AM 14/02/2012
Roadworks are occurring along the New England Highway at the intersection of Chalk Drive & James Streets in Toowoomba.
This works involves removing single phase cable & reconnecting to mains.
Work is commencing on 14/2/2012 to 27/02/2012 between 9:30am to 2:30pm.
Traffic control will be in place. Motorists can expect minor delays
INGHAM FORREST BEACH ROAD -
VICTORIA PLANTATION,
Northern,
05:08 PM 25/11/2011
Maintenance works will occur alongside Ingham-Forrest Beach Road, Victoria Plantation, from 25 November 2011 7:00am to 31 March 2012 5:00pm. Traffic controllers, speed restrictions and signage will be in place for the duration of the works.
INGHAM ROAD -
GARBUTT,
Northern,
09:00 AM 01/01/2012
Maintenance works will occur on Ingham Road, Garbutt, at the Hugh Street intersection from 1 January 2012 9:00am to 28 February 2012 3:00pm. Signage, speed restrictions and a partial closure of the southbound left lane will be in place.
INNISFAIL JAPOON ROAD -
MUNDOO,
Far North,
03:30 PM 05/12/2011
Construction works have commenced on the Innisfail-Japoon Rd, from the intersection of the Bruce Hwy to Aerodrome Rd near Mundoo. Lane closure's, speed reductions and or Traffic Control maybe in place 24hrs a day, 7 days a week. Expected completion January 2012. (1597I)
JACKSON WANDOAN ROAD -
WANDOAN,
Darling Downs,
06:00 AM 03/01/2012
Roadworks will be occurring along Jackson Wandoan Road, Wandoan.
These works include vegetation clearing on both sides of the road.
Work is commencing 03/01/2012 to 30/03/2012 between the hours of 06:00am & 06:00pm.
There will be reduced speed limits, partial lane closures and traffic control will be in place.
Motorists can expect delays.
JAMES STREET -
EAST TOOWOOMBA,
Darling Downs,
09:00 AM 04/03/2012
Roadworks will be occurring along the Warrego Highway between MacArthur Street and Hume Street in Toowoomba.
These works are Street Light Maintenance.
Work is commencing on 04/03/2012 between the hours of 09.00am & 03:00pm.
There will be reduced speed limits and partial lane closures.
Motorists can expect delays.
JAMES STREET -
NEWTOWN,
Darling Downs,
09:00 AM 19/02/2012
Roadworks will be occurring along the Warrego Highway between West Street and Taylor Street in Toowoomba.
These works are Street Light Maintenance.
Work is commencing 19/02/2012 to 25/03/2012 between the hours of 09.00am & 03:00pm. (Sunday Only)
There will be reduced speed limits and partial lane closures.
Motorists can expect delays.
JAMES STREET -
TOOWOOMBA CITY,
Darling Downs,
09:00 AM 22/02/2012
Roadwork will be occurring at the intersection of James St & Ruthven St in Toowoomba.
This work involves Traffic Signal Maintenance.
Work starts on the 22/02/2012 to 07/03/2012 between the hours of 9:00am to 3:00pm.
The northbound bicycle lane on Ruthven Street will closed during these works.
Traffic control & lane closures will be in place. Motorist should expect delays
KENNEDY HIGHWAY -
RAVENSHOE,
Far North,
05:30 AM 14/09/2011
Road widening works are continuing on the Kennedy Hwy between Tumoulin Rd and Kidner Rd, including the Kelso Road intersection.
The will include widening a 2.5km section of the highway to nine metres, and will improve safety for all road users. Works will be carried out between 6:00am and 6:00pm, Monday to Saturday and will continue until late 2011, weather permitting.
Motorists can expect delays of up to 15 minutes during the works and may wish to use an alternative route. Traffic will be reduced to one lane, and traffic controllers and a 40km/s speed limit will be in place to safeguard motorists and roadworkers.
There may be periods of time when access between Tumoulin Road and Kidner Road will be closed. During this time, access to local properties will be maintained, however detours will be in place for all other road users.
Motorists needing to travel through this site during the works are asked to contact the department on 4050 5434.
Signage will be in place at the following intersections to assist motorists with detours:
* Kennedy Highway and Tumoulin Road
* Kennedy Highway and Longlands Gap - Herberton Road
* East Eveyln Road and Millaa Millaa - Malanda Road
* Kennedy Highway and Malanda - Atherton Road
Local access onto the Kennedy Highway from Kidner Road will be maintained. (1612i)
KILKIVAN TANSEY ROAD -
TANSEY,
Wide Bay/Burnett,
02:34 PM 24/01/2012
On Kilkivan-Tansey Road the Godfried Creek bridge is currently load limited to 25 tonne. Transport and Main Roads is committed to a safe road network and the restricted load limit on the bridge is an interim measure to ensure safety until roadworks are completed. For more information contact the communication team in Gympie on 5482 0333.
KINGAROY BURRANDOWAN ROAD -
CHAHPINGAH,
Wide Bay/Burnett,
02:29 PM 24/01/2012
The bridge over Sandy Creek on the Kingaroy-Burrandowan Road is currently load limited to 20 tonne. Transport and Main Roads is committed to a safe road network and the restricted load limit on the bridge is an interim measure to ensure safety until bridge works are completed. For more information contact the communication team in Gympie on 5482 0333.
KOGAN CONDAMINE ROAD -
CROSSROADS,
Darling Downs,
06:00 AM 01/08/2011
Roadworks are occurring along Kogan Condamine Road.
These works include intersection upgrades on various locations along the road.
Work is commencing 07/07/11 to 28/01/12 between the hours of 06.00am and 06.00pm.
Motorists are being advised to expect delays, exercise caution and allow additional travel time.
LANDSBOROUGH HIGHWAY -
AUGATHELLA,
South West,
11:54 AM 23/02/2012
Roadworks are underway on the Landsborough Highway (Augathella to Tambo) at various sections. Delays of up to 20 mins can be expected. Traffic lights, traffic controllers, single lane closures and speed restrictions may be in place.
LANNERCOST STREET -
INGHAM,
Northern,
08:00 AM 20/02/2012
Footpath construction works at Lannercost Street near Tully street, Ingham will commence 20 February 2012 8:00am and finish on the 16 April 2012 5:00pm. Partial lane closure of the east bound lane will occur. Speed reductions and signage will be in place for the duration of the works.
LEICHHARDT HIGHWAY -
WANDOAN,
Darling Downs,
06:00 AM 03/01/2012
Roadworks will be occuring along the Leichhardt Highway South of Wandoan.
These works include vegetation clearing on both sides of the road.
Work is commencing 03/01/2012 to 30/03/2012 between the hours of 06:00am & 06:00pm.
There will be reduced speed limits, partial lane closures and traffic control will be in place.
Motorists can expect delays.
MACKAY BUCASIA ROAD -
BUCASIA,
Mackay/Whitsunday,
01:16 PM 21/01/2012
Mackay-Bucasia Road- Roadworks are occurring on Mackay-Bucasia Road between Eimeo Road and Kemp Street and are expected to take until mid 2012, weather permitting. Traffic control, single lane closures and speed restrictions will be used as required. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of road workers. For further information on these works, please contact the Mackay/Whitsunday region on 1300 736 754.
MACKAY EUNGELLA ROAD -
PLEYSTOWE,
Mackay/Whitsunday,
02:57 PM 03/01/2012
Mackay-Eungella Road- Reconstruction works are occurring on Mackay-Eungella Road between Yakapari–Balnagowan Road and Newbury–Mt Vince Road and are expected to be completed by early 2012, weather permitting. Traffic is under single lane operation during work hours and motorists can expect minor delays. For further information regarding these works please contact the Mackay/Whitsunday region on 1300 736 754.
MACKAY HABANA ROAD -
RICHMOND,
Mackay/Whitsunday,
03:07 PM 03/01/2012
Mackay-Habana Road- Roadworks are occurring on Mackay-Habana Road between Bovey Road and Waddells Road and are expected to be completed by early 2012, weather permitting. Traffic is under single lane operation during work hours and motorists can expect minor delays. For further information regarding these works please contact the Mackay/Whitsunday region on 1300 736 754.
MACROSSAN STREET (HOFFENSETZ STREET) -
HALIFAX,
Northern,
07:00 AM 12/12/2011
Works to install signs at Macrossan Street, Halifax will commence 12 December 2011 at 7:00am and finish 31 March 2012 at 5:00pm. Signage, speed reduction and traffic control will be on site for the duration of the works.
MALANDA MILLAA MILLAA ROAD (MILLAA MILLAA MALANDA ROAD) -
MILLAA MILLAA,
Far North,
10:00 AM 10/01/2012
Slope stabilisation works commence early January on the Millaa Millaa - Malanda Rd, Millaa Millaa. Lane closures & speed reductions will be in place. Works will be undertaken between 6:30am - 6:00pm, with expected completion mid March.
MARAJU YAKAPARI ROAD -
DUMBLETON,
Mackay/Whitsunday,
02:11 PM 03/01/2012
Maraju-Yakapari Road- Reconstruction works are occurring on sections of Maraju-Yakapari Road between Barclays Road and Balnagowan-Mandarana Road and are expected to be completed by early 2012, weather permitting. Traffic is under single lane operation during work hours and motorists can expect minor delays. For further information regarding these works please contact the Mackay/Whitsunday region on 1300 736 754.
MARYBOROUGH COOLOOLA ROAD -
TOOLARA FOREST,
Wide Bay/Burnett,
03:12 PM 20/01/2012
There are roadworks underway at various sections of Maryborough–Cooloola Road. Traffic signals, traffic controllers, single lane closures and speed restrictions will be used as required. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of roadworkers.
For further information on these works, please contact the communication team on 1300 728 390 during business hours or email reconstruct_widebayburnett@tmr.qld.gov.au
MIRANI ETON ROAD -
BRIGHTLY,
Mackay/Whitsunday,
03:01 PM 03/01/2012
Mirani-Eton Road- Roadworks are occurring on various sections of Mirani-Eton Road between Borgs Road and Marian-Eton Road and are expected to be completed by early 2012, weather permitting. Single lane closures,traffic signals and speed restrictions will be used as required and motorists can expect minor delays. For further information regarding these works please contact the Mackay/Whitsunday region on 1300 736 754.
MITCHELL HIGHWAY -
CUNNAMULLA,
South West,
02:20 PM 08/07/2011
Roadworks are underway on the Mitchell Highway (Barringun - Cunnamulla) from the NSW border to approximately 21km north of the border. Delays of up to 15 mins can be expected. During daylight hours traffic control will be in place. Traffic lights will be operating at night. Reduced speed limits are also in place.
MIVA ROAD -
GUNALDA,
Wide Bay/Burnett,
02:32 PM 24/01/2012
On Miva Road the bridge at Unnamed Creek (No 2) is currently load limited to 20 tonne. Transport and Main Roads is committed to a safe road network and the restricted load limit on the bridge is an interim measure to ensure the safety of road users until roadworks are completed. For more information contact the communication team in Gympie on 5482 0333.
MOSSMAN DAINTREE ROAD -
MOSSMAN,
Far North,
07:58 AM 13/01/2012
Roadworks commence early February on the Mossman Daintree road involving excavation and laying of pipes. Expected completion in late June 2012.
MOSSMAN MOUNT MOLLOY ROAD -
SHANNONVALE,
Far North,
08:40 AM 16/11/2011
Slope stabilisation works have commenced on Mossman-Mt.Molloy Rd, approx 4kms west of Mossman on the Rex Range. Traffic signals and/or traffic control will be in place. Expected completion late January 2012.
The reconstruction work is being delivered under the Natural Disaster Relief and Recovery Arrangements (NDRRA), a joint federal and state initiative. Your patience and cooperation is appreciated while the works are underway.
For more information, please call 1800 184 317* or email reconstruct_cairns@tmr.qld.gov.au
* Free call from anywhere in Australia, call charges apply for calls from mobile phones and payphones.
(1563I)
MUNGAR ROAD -
ANTIGUA,
Wide Bay/Burnett,
10:27 AM 12/01/2012
From Monday, 16 January, various roadworks will begin on a number of locations on Mungar Road between Thinoomba Road and the Hasselbach Bridge at Grahams Creek. Traffic signals, traffic controllers, single lane closures and speed restrictions will be used as required. Motorists are advised to drive to the changed conditions and obey all signage to ensure their safety and the safety of roadworkers. For further information on these works, please contact the communications team on 1300 728 390.
NATHAN STREET -
CRANBROOK,
Northern,
09:00 AM 14/02/2012
Changed traffic conditions will be in place on Nathan Street, Cranbrook, at the Alfred Street intersection due to works on the side road commencing 14 February 2012 9:00am and finishing 14 March 2012 3:30pm.
NATHAN STREET -
CRANBROOK,
Northern,
09:00 AM 14/02/2012
Nathan Street at the Bergin Road intersection is where the replacement of an air break switch will be occurring from 14 February to 14 March 2012. Works will commence at 9:00am and finish at 3:30pm daily. Traffic control, signage and speed restrictions will be in place on Bergin Road.
NATHAN STREET -
VINCENT,
Northern,
09:00 AM 13/02/2012
Works to repair existing crossover and renew exiting concrete driveway at Nathan Street between Fulham Road and Tyler Street,Vincent will commence 13 February at 9:00am and finish 24 February 2012 at 3:00pm. Signage and traffic controllers will be on site for the duration of the works.
NEW ENGLAND HIGHWAY -
GEHAM,
Darling Downs,
10:57 AM 06/10/2011
Roadworks are occurring along the New England Highway between Pioneer Rd and Geham Rd, Geham.
This work involves widening of the roads.
Work is expected to be completed by July 2012 weather permitting.
There will be reduced speed limits, partial lane closures and traffic control will be in place.
Motorists can expect delays.
NEW ENGLAND HIGHWAY -
HARLAXTON,
Darling Downs,
07:00 PM 12/02/2012
Roadworks are occurring along New England Highway between Murphy's Creek Road and Griffith Street
at Harlaxton.
These works involve pavement repairs and asphalt resurfacing.
Work is commencing on 12/02/2012 between the hours 7:00pm to 6:00am.
Traffic control and reduced speed limits will be in place, Motorists can expect delays.
PEAK DOWNS HIGHWAY -
MORANBAH,
Mackay/Whitsunday,
05:00 AM 23/01/2012
Peak Downs Highway - Reconstruction works are occurring on various sections of the Peak Downs Highway between Moranbah and Clermont through until December 2012. Motorists may experience some delays. For further information please contact Mackay/Whitsunday region on 4951 8555.
PENINSULA DEVELOPMENTAL ROAD -
LAURA,
Far North,
05:00 PM 07/02/2012
Building of a new road & road widening works have commenced on the Peninsula Developmental Road, cross street George Close.
Works will be carried out between 6:00am and 6:00pm, and will continue until early June 2012, weather permitting.
PENINSULA DEVELOPMENTAL ROAD -
LAURA,
Far North,
05:30 AM 14/09/2011
Bridge Construction works have commenced on the Peninsula Developmental Rd, approx. 2 to 4km's south of Laura. Lane closure's, speed restrictions and or traffic control maybe in place. (1380I)
PENINSULA DEVELOPMENTAL ROAD -
LAURA,
Far North,
12:30 PM 28/10/2011
Culvert repair works are continuing on the Peninsula Development Road at Possum Ck approximately 27kms north of Laura. Lane closures & traffic control will be in place.
QUEEN STREET -
AYR,
Northern,
06:30 AM 04/03/2012
Repair of overhead Street light at Queen Street between Edward Street and Young Street, Ayr will commence 04 March 2012 between 6:30am and 10:30am. During this time there will be full closure of Eastbound Left lane. Signage, detour and traffic controllers will be on site for the duration of the works.
RIVERWAY DRIVE (ROSS RIVER ROAD, UPPER ROSS RIVER ROAD) -
KELSO,
Northern,
06:30 AM 25/02/2012
Repair works on the footpath at Riverway Drive between Allambie Lane and Baldock Street, Kelso will commence 25 February and finish 02 March 2012. On weekdays the works will start at 6:30am and continue until 3:00pm and on Saturdays the work will commence at 9:00am and finish at 3:00pm. There will be partial closure of the shoulder along with signage, speed reduction and traffic controllers on site.
ROMA TAROOM ROAD -
EUTHULLA,
South West,
06:00 AM 07/06/2010
Roadworks are commencing on the Roma - Taroom Road approximately 55.0km to 60.0km north east from the Roma turnoff. Delays of up to 10 minutes can be expected during construction, and delays of up to 15 minutes can be expected during sealing works. Reduced speed limits are also in place.
ROSS RIVER ROAD -
AITKENVALE,
Northern,
06:00 AM 09/12/2010
Ross River Road and Nathan Street intersection will have redevelopment works taking place from 6 December 2010 to 30 June 2012 between the hours of 6:00am and 6:00pm. Changed traffic conditions will be in place.
Night works will take place on 11 January 2012 to 31 May 2012 between the hours of 6:00pm and 6:00am. Traffic controllers, speed reductions and signage will be in place for the duration of the works.
ROSS RIVER ROAD (HERVEY RANGE ROAD) -
THURINGOWA CENTRAL,
Northern,
06:00 AM 03/02/2012
Ross River Road in between Rolfe Street and Ridley Road is where a bus stop upgrade will be occurring from 1 February to 29 February 2012. Works will commence at 6:00am daily and will continue through until 4:00pm. Traffic control, signage and speed restrictions will be in place.
RUTHVEN STREET -
TOOWOOMBA CITY,
Darling Downs,
06:00 AM 24/02/2012
Roadwork's are occurring on the New England Hwy at the intersection of Bridge St & Ruthven St in Toowoomba.
This work involves replacement of Traffic Light and pole on northern side of intersection on Ruthven Street.
Work is commencing on 24/02/2012 to 09/03/12 between the hours of 07:00am & 03:00pm.(Weather permitting)
There will be reduced speed limits, partial lane closures and QPS will be conducting traffic control.
Motorists are advised to exercise caution when travelling through the area.
SAINT GEORGE DIRRANBANDI ROAD (CASTLEREAGH HIGHWAY) -
ST GEORGE,
South West,
03:21 PM 08/11/2011
Roadworks are commencing on the Castlereagh Highway between Noondoo and Dirranbandi. Delays of up to 20 minutes can be expected during construction. Reduced speed limits are also in place.
SERENITY ROAD -
BREDDAN,
Northern,
12:15 PM 17/02/2012
FLINDERS HIGHWAY - between Gladstone Creek Road and Serenity Road
Eastbound Overtaking Lane
Work is continuing on the construction of an eastbound overtaking lane near Charters Towers. Works will occur between 6:00am and 6:00pm.
Speed restrictions will be in place. Please follow the instructions of traffic controllers and drive with caution in this area.
STUART DRIVE (FLINDERS HIGHWAY) -
ROSENEATH,
Northern,
06:00 AM 01/02/2012
Works to construct a turning lane on Stuart Drive (Flinders Highway), Roseneath, will commence 1 February 2012 6:00am and finish 9 March 2012 6:00pm. Speed restrictions and a closure of the existing turning lanes into Karema Street will be in place.
TAYLOR STREET (CARRINGTON ROAD) -
GLENVALE,
Darling Downs,
09:00 AM 27/01/2012
Roadworks are occurring along Taylor Street in Toowoomba, between McDougall St & Boundary Rd.
This work involves Replacing Power Poles.
Work is commencing on 27/01/2012 to 29/02/2012
between the hours 9am and 3pm.
Traffic control will be in place. Motorists can expect minor delays.
TAYLOR STREET -
NEWTOWN,
Darling Downs,
09:00 AM 13/02/2012
Roadworks will be occurring along the Taylor Street between Tor Street and Nathan Street in Toowoomba.
These works are Street Light Maintenance.
Work is commencing 19/02/2012 to 25/03/2012 between the hours of 09.00am & 03:00pm. (Sunday Only)
There will be reduced speed limits and partial lane closures.
Motorists can expect delays.
TIN CAN BAY ROAD -
TOOLARA FOREST,
Wide Bay/Burnett,
11:37 AM 08/11/2011
Tin Can Bay Road at Coondoo Creek Bridge, 34km north east of Gympie, is temporarily reduced to one lane until bridge repairs can be carried out. Traffic signals are operating and motorist may experience some delays.
TOWNSVILLE ROAD (BRUCE HIGHWAY) -
INGHAM,
Northern,
08:00 AM 14/02/2012
Installation of signage at Townsville Road (Bruce Highway) adjacent to Macrossan Street intersection,Ingham will commence 14 February at 8:00am and finish 02 March 2012 at 5:00pm. Signage and traffic controllers will be on site for the duration of the works.
VICTORIA MILL ROAD (INGHAM FORREST BEACH ROAD) -
INGHAM,
Northern,
07:00 AM 10/01/2012
Construction works in the road shoulder of Victoria Mill Road, Ingham, just before Ingham-Forrest Beach Road will commence 10 January 2012 7:00am and finish 2 March 2012 4:30pm. Traffic control, signage and speed restrictions will be in place for the duration of the works.
WARREGO HIGHWAY -
BOWENVILLE,
Darling Downs,
09:00 AM 11/01/2012
Roadworks will be occurring along the Warrego Highway near Auchmah Road between Bowenville and Dalby.
These works are to repair structural deficiencies in the culvert under the road.
Work is expected to be completed by February 2012.
There is a 5.4 metre high restriction to excess mass and dimension vehicles. Refer to Excess Mass and Dimension Conditions on TMR website for further details.
Motorists may experience delays as the highway will have reduced speed limits in place.
WARREGO HIGHWAY -
DULACCA,
Darling Downs,
06:00 AM 09/02/2012
Roadworks are occurring on the Warrego Highway between Drillham and Dulacca.
The roadworks include pavement repairs, pavement rehabilitation and bitumen resurfacing.
Work is commencing 9/01/12 to mid-June 2012, between the hours of 6am and 6pm, weather permitting.
Refer to Excess Mass and Dimension Conditions on TMR website for further details.
There will be single lane closures and temporary speed reductions during working hours.
Delays of up to 10 minutes are expected.
WARREGO HIGHWAY (MURILLA STREET) -
MILES,
Darling Downs,
02:29 PM 09/01/2012
Roadworks are occurring along the Warrego Highway between Fairymeadow Road & the intersection of the Leichhardt Highway.
This work involves a Seismic Survey of the road.
Work is commencing 05/01/12 to 04/03/12 between the hours of 06:00am & 06:00pm.
There will be reduced speed limits affecting traffic travelling in both directions.
WARREGO HIGHWAY (MURILLA STREET) -
MILES,
Darling Downs,
06:00 PM 23/02/2012
Roadworks will be occurring along Warrego Hwy at Miles..
This work involved asphalt resurfacing at Dogwood Creek.
Work is commencing on 22/02/2012 & 23/02/2012 between the hours 6:00pm to 6:00am.
Traffic control and reduced speed limits will be in place, Motorists can expect delays.
WARREGO HIGHWAY -
MITCHELL,
South West,
12:00 PM 23/02/2012
Maranoa River Bridge, Mitchell
Motorists are advised that the bridge is open to traffic. Weight restrictions have been lifted. A 40km per hour speed limit with single lane access and 24 hours a day seven days a week traffic control is in place. A 3.5m maximum width restriction is also in place.
WARREGO HIGHWAY -
OAKEY,
Darling Downs,
06:00 PM 20/02/2012
Roadworks are occurring along the Warrego Highway East of Oakey.
These works include a new 1.4 km passing lane from Brimblecombes Rd to Henningsen Rd.
Work is expected to be completed by May 2012.
Between the hours of 6pm to 6am.
Motorist should expect delays.
WARREGO HIGHWAY -
OAKEY,
Darling Downs,
07:00 AM 07/03/2012
Roadworks are occurring along the Warrego Highway, Oakey, between Oakey Biddeston Road & Devon Park Road.
These works include a road surface re-seal.
Work is commencing 07/03/12 to 15/03/12 between the hours of 07:00am & 05:00pm.
There will be reduced speed limits, partial lane closures and traffic control will be in place.
Moderate delays are to be expected.
WARREGO HIGHWAY -
REDWOOD,
Darling Downs,
06:00 PM 14/02/2012
Roadworks are occurring along the Warrego Highway on the Toowoomba Range.
This will be affecting Eastbound traffic only.
These works are to reinstate rock fences.
Work is commencing 13/02/2012 to 09/03/2012 between the hours of 06.00pm & 06.00am.
There will be reduced speed limits, partial lane closures and traffic control will be in place.
Motorists can expect delays.
WARREGO HIGHWAY -
WARRA,
Darling Downs,
11:25 AM 07/06/2011
Roadworks are occurring along the Warrego Highway between Macalister and Warra.
Work is to be completed by the end of November 2012.
Motorists should expect delays of 10-15min in different sections of this work site. Traffic controllers and traffic lights will also be in operation throughout the term of the upgrade.
Heavy Vehicle operators are advised there will be restricted conditions through the worksite, all operators should check with the local authority for more detail.
WARREGO HIGHWAY EAST (WARREGO HIGHWAY) -
ROMA,
South West,
03:26 PM 08/11/2011
Roadworks are commencing on the Warrego Highway from Jackson to Roma at various chainages. Delays of up to 20 minutes can be expected during construction. Reduced speed limits are also in place and traffic is being led by a pilot vehicle in places.
WOOLCOCK STREET (TOWNSVILLE PORT ROAD) -
CURRAJONG,
Northern,
07:00 AM 07/02/2012
Works to install signage will occur on Woolcock Street, Currajong, at the Atlee Street intersection from 7 February 2012 7:00am to 30 March 2012 5:00pm. Signage, speed restrictions and traffic control will be in effect for the duration of the works.
WOOLCOCK STREET (WOOLCOCK STREET SERVICE ROAD, BRUCE HIGHWAY) -
GARBUTT,
Northern,
07:00 AM 09/01/2012
Construction works will occur alongside Woolcock Street, Garbutt, between Langton Street and Hartley Street from 9 January 2012 7:00am to 29 February 2012 6:00pm. Signage, traffic controllers and speed restrictions will be present for the duration of the works.
YABBA CREEK ROAD (YABBA ROAD) -
IMBIL,
Wide Bay/Burnett,
02:31 PM 24/01/2012
The Yabba Creek No 6 bridge on Yabba Creek Road is currently load limited to 20 tonne. Transport and Main Roads is committed to a safe road network and the restricted load limit on this bridge is an interim measure to ensure safety until roadworks are completed. For more information contact the communication team in Gympie on 5482 0333.
YAKAPARI SEAFORTH ROAD -
SEAFORTH,
Mackay/Whitsunday,
08:00 AM 09/01/2012
Yakapari-Seaforth Road- Roadworks are occurring on Yakapari – Seaforth Road from the bottom of the range for almost 3kms and are expected to be completed by mid 2012, weather permitting. Traffic is under single lane operation during work hours and motorists can expect minor delays. For further information regarding these works please contact the Mackay/Whitsunday region on 1300 736 754.
YOUNG STREET -
AYR,
Northern,
06:00 AM 06/02/2012
Pavement and kerb works will occur on Young Street, Ayr, from Queens Street to Graham Street commencing 6 February 2012 6:00am and finishing 16 March 2012 5:00pm. Signage, speed restrictions and traffic controllers will be on site during this time.
YOUNGMAN STREET (BUNYA HIGHWAY) -
KINGAROY,
Wide Bay/Burnett,
11:45 AM 08/11/2011
Roadworks on Youngman Street (Bunya Highway) between River Road roundabout and the showgrounds in Kingaroy are expected to start this week, weather permitting. Works are expected to be completed mid 2012. Motorists may experience some delays.